Search results

You searched for Panel Machine

Results 941 – 950 of about 992.

Refine by:

  • All results
  • Https://www.edinburgh.gov.uk/information-for-social-workers

    Useful referral forms:  TcAc Social Workers Referral Form  TcAc Young Person’s Referral Form  Health referral form  Throughcare and Aftercare Housing and Support Panel  Practitioners checklist for leaving care  Venture Trust - Inspiring Young Futures Contact Form  Passport Project referral form  Mental Health Workers Referral Form All forms are available in downloads on our web pages.

    https://www.edinburgh.gov.uk/downloads/file/23190/information-for-social-workers
  • CITY OF EDINBURGH COUNCIL

    If Scottish Ministers did decide to call in the decision it would be referred to a School Closure Review Panel for determination.... The Panel must give reasons for its decision. 10.21 An appeal may be made to the sheriff against a decision of a School Closure Review Panel by the education authority or a relevant consultee in relation to the closure proposal.... In the appeal the sheriff can either (a) confirm the decision or (b) quash the decision and refer the matter back to the Panel.

    https://www.edinburgh.gov.uk/downloads/file/22442/consultation-paper
  • Https://www.edinburgh.gov.uk/sustainability-statement-form---guidance-notes

    Sustainability Statement Form – Notes for Guidance Low and zero carbon equipment includes: • Solar panels (photovoltaic and solar water heating) • Ground, air or water source heat pumps • Wind turbines • Biomass or combined heat and power boilers • Micro-hydro • Or fuel storage or pipes, flues or equipment for any of the above Please note that if such plans are not submitted with the current planning application, a further ap-plication, or a variation to your planning permission, may be required.

    https://www.edinburgh.gov.uk/downloads/file/32036/sustainability-statement-form---guidance-notes
  • Https://www.edinburgh.gov.uk/all-school-application

    Section C applications are referred to the Travel Allocation Panel for assessment and decision.

    https://www.edinburgh.gov.uk/downloads/file/29087/all-school-application
  • Https://www.edinburgh.gov.uk/roseburn-to-union-canal-update-september-2024

    Steps are in place alongside the ramp leading up from Russell Road and protective glass panelling has been installed to complete the work.

    https://www.edinburgh.gov.uk/downloads/file/35775/roseburn-to-union-canal-update-september-2024
  • Https://www.edinburgh.gov.uk/sustainability-statement-form-guidance-notes

    Sustainability Statement Form – Notes for Guidance Low and zero carbon equipment includes: • Solar panels (photovoltaic and solar water heating) • Ground, air or water source heat pumps • Wind turbines • Biomass or combined heat and power boilers • Micro-hydro • Or fuel storage or pipes, flues or equipment for any of the above Please note that if such plans are not submitted with the current planning application, a further ap-plication, or a variation to your planning permission, may be required.

    https://www.edinburgh.gov.uk/downloads/file/32036/sustainability-statement-form-guidance-notes
  • Https://www.edinburgh.gov.uk/home-to-school-assisted-travel-school-transport-application-form

    Section C applications are referred to the Travel Allocation Panel for assessment and decision.

    https://www.edinburgh.gov.uk/downloads/file/29362/home-to-school-assisted-travel-school-transport-application-form
  • RIVER ALMOND WALKWAY

     Keep the local community up-to-date with developments on site through posters on the entrance panels and a annual newsletter...  Keep the local community up-to-date with developments on site through posters on the entrance panels and a yearly newsletter....  Keep the local community up-to-date with developments on site through posters on the entrance panels and a annual newsletter

    https://www.edinburgh.gov.uk/downloads/file/22601/river-almond-walkway-management-plan-2011-2020
  • RIVER ALMOND WALKWAY

     Keep the local community up-to-date with developments on site through posters on the entrance panels and a annual newsletter...  Keep the local community up-to-date with developments on site through posters on the entrance panels and a yearly newsletter....  Keep the local community up-to-date with developments on site through posters on the entrance panels and a annual newsletter

    https://www.edinburgh.gov.uk/downloads/file/22601/river-almond-walkway-management-plan-2011---2020
  • Https://www.edinburgh.gov.uk/design-report

    © 7N Architects (Randolph) Ltd. 2024 NOTES P03 As indicated Second Floor As Proposed - NO ANNO 164 Granton Lighthouse City of Edinburgh Council 7NA-GL-02-DR-A-10103 24.02.28 For Information 10 m 0 2m 5m 1:100 1m Rev Date Reason For Issue Chk P01 24.01.17 Draft for Coordination 7N P02 24.02.08 Draft for Coordination 7N P03 24.02.28 For Information 7N Key Community use / Shared Circulation (Public Access) Tenant Unit Circulation (Private) Plant / BOH / WCs Areas Existing Proposed Linings/ Partitions Developed Proposals - Level 3 & Roof Plan Photovoltaic panels Lighthouse Viewing Lantern 6m2 Drawing Key: Existing building walls & build-ups New partitions/ linings New or replaced elements Existing elements Workspace Workspace circulation Cafe/ public space Public circulation Back-of-house/ plant space Optional Items - refer to notes N 0 0.5 1 5m2 1:100 7 Randolph Place, Edinburgh EH3 7TE +44 (0) 131 220 5541 www.7narchitects.com Scale Status Drawing Title Proj No.... Elevations East Elevation (Courtyard) West Elevation (Rear) Fabric Repairs and Upgrades - Improving Performance, Reducing Emissions W-EXTG Breathable insulation to existing walls WIN-EXTG Existing windows overhauled with addition of secondary glazing for thermal and acoustic insulation CL-01 New fire rated ceiling lining including insulation to provide structural fire protection FL-01 New microtop polished concrete finish to existing slabs FL-02 Existing floorboards sanded and lacquered WIN-02 New high-level windows to rear elevation RF-EXTG Breathable insulation PV-01 Photovoltaic solar panels to generate renewable energy Existing trusses retained Outline Specification 1.... Solar photovoltaic panels will be installed in the central valley of the double hip section of roof, hiding them from view from the street.

    https://www.edinburgh.gov.uk/downloads/file/34807/design-report