Search results

You searched for plan event

Results 4671 – 4680 of about 8074.

Refine by:

  • All results
  • Lasswade Road

    City Mobility Plan... Our Future Streets circulation plan

    https://www.edinburgh.gov.uk/road-projects-improvements/lasswade-road
  • Feedback updated 26 Jan 2023

    More information about what was said and what actions are planned is available in sections 2.2 and 2.3 of the SEA Post Adoption Statement - a download link is included below.... Scottish Local Authorities are required to conduct Strategic Environmental Assessments (SEA) on strategies and plans to assess their impact on the environment, and then to consult on those.

    https://consultationhub.edinburgh.gov.uk/ce/climatesea/
  • Cycling and walking improvements from Inverleith Place to the Goldenacre Path

    Senior Project Officer, Active Travel Action Plan)... These designs are part of planned improvements to the cycling route, called QuietRoute 20.

    https://consultationhub.edinburgh.gov.uk/sfc/design-cycle-walk-inverleith-row-goldenacre-path/
  • Cycling and walking improvements on Balgreen Road

    Senior Project Officer, Active Travel Action Plan)... These designs are part of planned improvements to the cycling route, called QuietRoute 8.

    https://consultationhub.edinburgh.gov.uk/sfc/design-cycle-walk-balgreen-road/
  • Cycling and walking improvements on McDonald Road

    Senior Project Officer, Active Travel Action Plan)... These designs are part of planned improvements to the cycling route, called QuietRoute 20.

    https://consultationhub.edinburgh.gov.uk/sfc/design-cycle-walk-mcdonald-road/
  • Roseburn to Leith Walk cycle link and street improvements

    The proposed cycle route would link with similar planned facilities on Leith Walk and Leith St to the east.... These improvements are being carefully integrated into major public realm works already underway and planned at St Andrew Square, Charlotte Square and George Street.

    https://consultationhub.edinburgh.gov.uk/sfc/roseburntoleith/
  • Cycling and walking improvements between Saughton Park and QuietRoute 8

    Senior Project Officer, Active Travel Action Plan)... These designs are part of planned improvements to the cycling route, called QuietRoute 8.

    https://consultationhub.edinburgh.gov.uk/sfc/design-cycle-walk-saughton-park-quietroute-8/
  • Https://www.edinburgh.gov.uk/seafield-sounding-board---note-of-meeting-12-april-2023

    A reporter has been allocated to City Plan 2030.... A consultation event was undertaken in Leith Academy... The community favour an infrastructure-first plan

    https://www.edinburgh.gov.uk/downloads/file/33394/seafield-sounding-board---note-of-meeting-12-april-2023
  • Https://www.edinburgh.gov.uk/seafield-sounding-board-note-of-meeting-12-april-2023-

    A reporter has been allocated to City Plan 2030.... A consultation event was undertaken in Leith Academy... The community favour an infrastructure-first plan

    https://www.edinburgh.gov.uk/downloads/file/33394/seafield-sounding-board-note-of-meeting-12-april-2023-
  • Https://www.edinburgh.gov.uk/note-of-meeting-12-april-2023

    A reporter has been allocated to City Plan 2030.... A consultation event was undertaken in Leith Academy... The community favour an infrastructure-first plan

    https://www.edinburgh.gov.uk/downloads/file/33394/note-of-meeting-12-april-2023