Search results

You searched for plan event

Results 5181 – 5190 of about 8074.

Refine by:

  • All results
  • Https://www.edinburgh.gov.uk/low-emission-zones-consultation-2019-summary-of-findings-scott-porter-2019

    ▪ Engagement with primary school children  Data was gathered from activities at the Clean Air Day 2019 event, including a tally of support for the scheme... ▪ The perceived and real overlaps between the LEZ, the City Mobility Plan and the Edinburgh City Centre Transformation Plan need to be considered and reviewed to ensure all are implemented efficiently and optimally....  Final thoughts were to use synergy between the LEZ scheme, the City Mobility Plan and the City Transformation Plan to aid the success of all 3

    https://www.edinburgh.gov.uk/downloads/file/30524/low-emission-zones-consultation-2019-summary-of-findings-scott-porter-2019
  • Https://www.edinburgh.gov.uk/low-emission-zones-consultation-2019-summary-of-findings-scott-porter-2019-

    ▪ Engagement with primary school children  Data was gathered from activities at the Clean Air Day 2019 event, including a tally of support for the scheme... ▪ The perceived and real overlaps between the LEZ, the City Mobility Plan and the Edinburgh City Centre Transformation Plan need to be considered and reviewed to ensure all are implemented efficiently and optimally....  Final thoughts were to use synergy between the LEZ scheme, the City Mobility Plan and the City Transformation Plan to aid the success of all 3

    https://www.edinburgh.gov.uk/downloads/file/30524/low-emission-zones-consultation-2019-summary-of-findings-scott-porter-2019-
  • Https://www.edinburgh.gov.uk/eria-review-of-employment-support-services-for-people-with-a-disability

    decisions, projects, programmes, policies, services, reviews, plans, functions or practices that relate to the Corporate ERIA Title): Policies and Services Date ERIA commenced 1.... To ensure they have follow up feedback on the review and the recommendations, a series of public events are planned for May 2013.... Comments from these events will be incorporated into the final report to go to council committee. 7.

    https://www.edinburgh.gov.uk/downloads/file/25598/eria-review-of-employment-support-services-for-people-with-a-disability
  • Https://www.edinburgh.gov.uk/evaluation-of-the-20mph-speed-limit-roll-out-three-years-post-implementation

    Short term results are influenced by weather and temporary events such as local traffic diversions and road works. 4.26 Generally, all NO2 automatic monitoring locations in Edinburgh show a downward trend in NO2 concentrations - see Graph 1 below for an example at the urban background monitoring site at St Leonards.... It is planned to continue with measures to sustain a culture of 20mph city driving.... A detailed communication and engagement plan supported scheme implementation, with each phase accompanied by a targeted awareness raising campaign to familiarise different road users with the scheme and encourage compliance with the new speed limit. 7.2 Communication channels included media promotion, outdoor advertising, lamp post banners, bus advertising, radio, leaflets, posters, videos, information packs and community events.

    https://www.edinburgh.gov.uk/downloads/file/32217/evaluation-of-the-20mph-speed-limit-roll-out-three-years-post-implementation
  • Document Title

    Under the ‘Planning etc.... This means that in large storm events or when water pipes fail surface water may not be removed quickly and damage to property can incur.... The calculation considers the volume of water intercepted by vegetation, the volume of water dripping from the saturated canopy minus water evaporation from the canopy during the rainfall event, and the volume of water evaporated from the canopy after the rainfall event.

    https://www.edinburgh.gov.uk/downloads/file/22641/valuing-edinburghs-urban-trees
  • Document Title

    Under the ‘Planning etc.... This means that in large storm events or when water pipes fail surface water may not be removed quickly and damage to property can incur.... The calculation considers the volume of water intercepted by vegetation, the volume of water dripping from the saturated canopy minus water evaporation from the canopy during the rainfall event, and the volume of water evaporated from the canopy after the rainfall event.

    https://www.edinburgh.gov.uk/downloads/file/22641/valuing-edinburgh-s-urban-trees
  • Https://www.edinburgh.gov.uk/tro-23-17-plans

    INFRASTRUCTURE NOTES: PLACE PLANNING AND TRANSPORT INFRASTRUCTURE TRANSPORT DESIGN & DELIVERY The City of Edinburgh Council Waverley Court 4 East Market Street Edinburgh, EH8 8BG Telephone: 0131 200 2000 DRG.... INFRASTRUCTURE NOTES: PLACE PLANNING AND TRANSPORT INFRASTRUCTURE TRANSPORT DESIGN & DELIVERY The City of Edinburgh Council Waverley Court 4 East Market Street Edinburgh, EH8 8BG Telephone: 0131 200 2000 DRG.... Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. 100023420 (2017) TRO_020TRO_020 TRO_020 TRO_020 NOTES: INFRASTRUCTURE CHECKEDDETAILSREVISION BY DATE PLACE PLANNING AND TRANSPORT INFRASTRUCTURE TRANSPORT DESIGN & DELIVERY The City of Edinburgh Council Waverley Court 4 East Market Street Edinburgh, EH8 8BG Telephone: 0131 200 2000 DRG.

    https://www.edinburgh.gov.uk/downloads/file/33732/tro-23-17-plans
  • Notice of meeting and agenda

    We appreciate that losing a baby is one of the most traumatic events that you can go through and we want to be able to support you as best we can.... Continuous SPL 5.68 Continuous SPL is where you plan to take only one period of SPL.... In the event of failure to reach agreement, both parties reserve the right to terminate this local agreement by giving four months notice in writing.

    https://www.edinburgh.gov.uk/downloads/file/26907/maternity-paternity-adoption-and-shared-parental-leave-policy
  • Notice of meeting and agenda

    We appreciate that losing a baby is one of the most traumatic events that you can go through and we want to be able to support you as best we can.... Continuous SPL 5.68 Continuous SPL is where you plan to take only one period of SPL.... In the event of failure to reach agreement, both parties reserve the right to terminate this local agreement by giving four months notice in writing.

    https://www.edinburgh.gov.uk/downloads/file/25729/maternity-paternity-adoption-and-shared-parental-leave-policy
  • Additional Traffic Management Arrangements as of 4 July

    traffic management plan (PDF)... traffic management plan.... View the traffic management plans.

    https://www.edinburgh.gov.uk/tramstonewhaven/news/article/335/additional-traffic-management-arrangements-as-of-4-july