Search results

You searched for plan event

Results 5251 – 5260 of about 8074.

Refine by:

  • All results
  • Notice of meeting and agenda

    Orb guidance 4.2 Any colleagues planning to undertake consultation, or involved in community and public engagement, are required to follow the process detailed on the Orb.... The standards help colleagues to consider how they will involve stakeholders in shaping local plans and services, ensure that the consultation or engagement process is fair and effective, and demonstrate that genuine dialogue has enabled people to influence decisions or shape proposals.... Consultation/Engagement plans, and supporting paperwork, should be submitted to the panel two weeks before the meeting.

    https://www.edinburgh.gov.uk/downloads/file/30544/consultation-and-engagement-policy
  • Notice of meeting and agenda

    Functionality includes: 3.7.1 Creating and managing an online presence for consultation/engagement activity; detailing important information, key dates, events and related documents relevant to the issue being consulted on. 3.7.2 In-built survey creation tool. 3.7.3 Analysis and reporting of data. 3.7.4 Publishing results and feedback from consultation/engagement activities. 3.7.5 Search engine allowing users to find consultation/engagement acticities by area, audience, interest, postcode etc.... E-Learning module” 4.2 Any colleagues planning to undertake consultation, or involved in community and public engagement, are required to complete the e-learning module .... Consultation/Engagement plans, and supporting paperwork, should be submitted to the panel two weeks before the meeting.

    https://www.edinburgh.gov.uk/downloads/file/32024/consultation-engagement-policy-v2-1
  • Https://www.edinburgh.gov.uk/apply-for-permission-to-operate-mobile-cranes-hoists-or-cherry-pickers

    Date Works Planned Start Date Completed Date Duration 4.... One copy of a plan (dimensioned and to an appropriate scale) showing the position of the hoist and the part of the road to be occupied.... IMPORTANT NOTICE SERVICE LIST FOR PERMIT APPLICATIONS * Scottish Water do not require plans to be submitted.

    https://www.edinburgh.gov.uk/downloads/file/23628/apply-for-permission-to-operate-mobile-cranes-hoists-or-cherry-pickers
  • Habitat

    This has to be worked into a plan-making process and procedural guidance on the application of the Habitats Regulations to the development planning system in Scotland provided in Appendix 1 to planning circular 1/2009. 2.3 Stages of the HRA process for plans Scottish Natural Heritage (SNH)/NatureScot) guidance sets out a series of (potentially) 13 stages of the HRA process for plans.... To prevent pollution events, there should be standard adherence to pollution control measures e.g.... Bioquarter has planning permission in principle (renewed in 2019), Edinburgh park still has outline planning permission.

    https://www.edinburgh.gov.uk/downloads/file/30013/habitat-regulations-appraisal-proposed-plan-stage
  • Https://www.edinburgh.gov.uk/currie-primary-school-workshop-17-january-2018

    West Lothian could change its plans etc and we could then be left with additional costs/capacity if they later decide to change their catchments etc and build new schools... Lots of events are held, so kids from the whole catchment come for activities, meaning they know each other before they start at the school... If these events end up hosted elsewhere then this will be harder to achieve

    https://www.edinburgh.gov.uk/downloads/file/22505/currie-primary-school-workshop-17-january-2018
  • Https://www.edinburgh.gov.uk/travelling-safely-and-low-traffic-neighbourhood-schemes

    Links to further information Traffic Scotland - realtime information on trunk roads including Edinburgh City Bypass Details of Ward and Locality boundaries SE Scotland trunk roads maintenance by BEAR Scotland Transport for Edinburgh - Lothian Buses and Edinburgh Trams Scottish Roadworks Register X (formerly Twitter) Facebook ThreadsEdintravel on social media: Roadworks & events report Travelling Safely and Low Traffic Neighbourhood schemes Planned roadworks and events affecting major routes have been approved by the Citywide Traffic Management Group (a partnership between City of Edinburgh Council Transport Officers, Lothian Buses and Police Scotland.)

    https://www.edinburgh.gov.uk/downloads/file/34236/travelling-safely-and-low-traffic-neighbourhood-schemes
  • Https://www.edinburgh.gov.uk/currie-primary-school-workshop-17-january-2018

    West Lothian could change its plans etc and we could then be left with additional costs/capacity if they later decide to change their catchments etc and build new schools... Lots of events are held, so kids from the whole catchment come for activities, meaning they know each other before they start at the school... If these events end up hosted elsewhere then this will be harder to achieve

    https://www.edinburgh.gov.uk/downloads/file/22479/currie-primary-school-workshop-17-january-2018
  • Https://www.edinburgh.gov.uk/cd2311-health-and-safety-findings-only-report

    Recommendations and Management Action Plan: Skills, experience, and knowledge of managers Ref.... The door opened inwards against the obstructions which would prevent people from the adjacent building using this exit if required in the event of an emergency... Recommendations and Management Action Plan: Key person dependency Ref.

    https://www.edinburgh.gov.uk/downloads/file/34269/cd2311-health-and-safety-findings-only-report
  • Https://www.edinburgh.gov.uk/sustainable-rainwater-management-guidance---factsheet-w2---swales

    The type of construction, function, planting and related maintenance requirements should be agreed with the adopting authority as part of the planning and design process.... DO allow for a minimum 1 in 30 year rainfall event in the swale design.... Wet swale populated with invasive bull rush, Heriot Watt Campus | SNH The Maintenance Plan All SuDS features will require a maintenance plan that should include detailed specifications, frequency, timing, equipment and annual costs.

    https://www.edinburgh.gov.uk/downloads/file/30099/sustainable-rainwater-management-guidance---factsheet-w2---swales
  • Https://www.edinburgh.gov.uk/sustainable-rainwater-management-guidance-factsheet-w2-swales

    The type of construction, function, planting and related maintenance requirements should be agreed with the adopting authority as part of the planning and design process.... DO allow for a minimum 1 in 30 year rainfall event in the swale design.... Wet swale populated with invasive bull rush, Heriot Watt Campus | SNH The Maintenance Plan All SuDS features will require a maintenance plan that should include detailed specifications, frequency, timing, equipment and annual costs.

    https://www.edinburgh.gov.uk/downloads/file/30099/sustainable-rainwater-management-guidance-factsheet-w2-swales