Search results

You searched for plan event

Results 5941 – 5950 of about 8078.

Refine by:

  • All results
  • Https://www.edinburgh.gov.uk/room-plan

    Room Name AV Power Points Natural Light Blackout Blinds Lighting Effects Council Chambers Portable 10 Yes Yes Yes European Room Portable 7 Yes Yes Yes Dunedin Room Portable 3 Yes Shutters No Diamond Jubilee Room Portable 5 Yes Shutters No Mandela Room Static 3 Yes Shades Yes Dean of Guild Court Room Static 10 Yes No No Dean of Guild Waiting Room Portable 5 Yes No No Business Centre Static 5 Yes Yes Yes The City Chambers – Facilities/Capacities – Room Name Theatre Style Classroom U-shape Banquet/ Formal Dinner/ Cabaret Style Reception Boardroom Council Chamber 120 15/30/60 30 120 200 40 Including Gallery 175 – – – – – Including lunch 90 – – – – – Lunch in European Rm 100/120 – – – – – European Room Without catering 90 12/24 26 60 110 40 With catering 60/70 9/18 20 50/60 110 – Councillors’ Lounge – – – 14 70 – Dunedin Room – – – 24 – 27 Diamond Jubilee Room – – – 24 25 30 Mandela Room – – – – – 16 Dean of Guild Court Room – – 35 – – 35 Dean of Guild Waiting Room 20 – 14 – – 12 Business Centre Auditorium 60 6/12/18 up to 34 – 60 – Breakout Area 1 – 12 – – 60 – Breakout Area 2/ Catering Area – 14 – – – Breakout Area 3 – 15 12 – – The City Chambers – Room Plans – L: 8.85m W: 7.34m Business Centre Main Auditorium Council Chamber Dunedin Room European Room Mandela Room Diamond Jubilee Room KEY Powerpoints P Sockets M P P P Screen Entrance Entrance PP P PP PP PP Door to Kitchen Door to Service Area Public Gallery Stairwell Entrance Fireplace P P P P P P M P M PM P M P M M P P M P L: 9.85m W: 7.34m L: 11.95m W: 5.77m L: 16.5m W: 10.5m L: 11m W: 6m Doors to Diamond Jubilee Room Main Entrance Door to Service Area P P P M Entrance to Councillors’ Lounge Entrance to Councillors’ Lounge M P P M P P P T P P Entrance Door to Service Area L: 13m W: 9m Fireplace Fireplace Entrance P P P P P P P P P P P P P P P EntranceSide Entrance Fireplace Doors to the Dunedin Room L: 14m W: 6wm

    https://www.edinburgh.gov.uk/downloads/file/22547/room-plan
  • Esri Accessibility Conformance Report_StoryMaps

    Not Evaluated 2.2.1 Timing Adjustable (Level A) For each time limit that is set by the content, at least one of the following is true: • Turn off: The user is allowed to turn off the time limit before encountering it; or • Adjust: The user is allowed to adjust the time limit before encountering it over a wide range that is at least ten times the length of the default setting; or • Extend: The user is warned before time expires and given at least 20 seconds to extend the time limit with a simple action (for example, "press the space bar"), and the user is allowed to extend the time limit at least ten times; or Not Applicable https://www.w3.org/WAI/WCAG21/Understanding/character-key-shortcuts.html https://www.w3.org/WAI/WCAG21/Understanding/timing-adjustable.html 10/12/2020 Web Content Accessibility Requirements (WCAG) Report Voluntary Product Accessibility Template (VPAT) 2.4 15 ArcGIS StoryMaps Criteria Conformance Level Remarks and Explanations • Real-time Exception: The time limit is a required part of a real-time event (for example, an auction), and no alternative to the time limit is possible; or • Essential Exception: The time limit is essential and extending it would invalidate the activity; or • 20 Hour Exception: The time limit is longer than 20 hours.... Supports 2.5.1 Pointer Gestures (Level A – WCAG 2.1 only) Not Evaluated https://www.w3.org/WAI/WCAG21/Understanding/page-titled.html https://www.w3.org/WAI/WCAG21/Understanding/focus-order.html https://www.w3.org/WAI/WCAG21/Understanding/link-purpose-in-context.html https://www.w3.org/WAI/WCAG21/Understanding/multiple-ways.html https://www.w3.org/WAI/WCAG21/Understanding/headings-and-labels.html https://www.w3.org/WAI/WCAG21/Understanding/focus-visible.html https://www.w3.org/WAI/WCAG21/Understanding/pointer-gestures.html 10/12/2020 Web Content Accessibility Requirements (WCAG) Report Voluntary Product Accessibility Template (VPAT) 2.4 18 ArcGIS StoryMaps Criteria Conformance Level Remarks and Explanations All functionality that uses multipoint or path-based gestures for operation can be operated with a single pointer without a path- based gesture, unless a multipoint or path-based gesture is essential. 2.5.2 Pointer Cancellation (Level A – WCAG 2.1 only) For functionality that can be operated using a single pointer, at least one of the following is true: • No Down-Event: The down-event of the pointer is not used to execute any part of the function • Abort or Undo: Completion of the function is on the up- event, and a mechanism is available to abort the function before completion or to undo the function after completion • Up Reversal: The up-event reverses any outcome of the preceding down-event • Essential: Completing the function on the down-event is essential Not Evaluated 2.5.3 Label in Name (Level A – WCAG 2.1 only) For user interface components with labels that include text or images of text, the name contains the text that is presented visually.... Not Applicable 502.3.14 Event Notification Notification of events relevant to user interactions, including but not limited to, changes in the component’s state(s), value, name, description, or boundary, shall be available to assistive technology.

    https://www.edinburgh.gov.uk/downloads/file/29469/arcgis-story-maps-accessibility-report
  • Https://www.edinburgh.gov.uk/po-22-01-draft-plans

    Amendment DetailsDate Drw'n Chk'd App'd Date Date Date Date Drawing Number Revision Scale Designed Drawn Checked Approved Drawing Title Project Title Drawing Status A3 Sweco 2nd Floor, Quay 2 139 Fountainbridge Edinburgh EH3 9QG Tel: +44 (0)131 550 6300 Web: www.sweco.co.uk Quartermile For Information The Haymarket Stopped Up Boundary Revision 2 Location Plan 1:500 RE 07.06.22 RE 07.06.22 GK 07.06.22 GK 07.06.22 121828_SK100 Area which requires to be stopped up D A L R Y R O A D M O R R I S O N S T R E E T 5 4 3 2 INTERSECTION OF PROJECTED MORRISON STREET AND DALRY ROAD KERBLINE 1 1.

    https://www.edinburgh.gov.uk/downloads/file/33529/po-22-01-draft-plans
  • Https://www.edinburgh.gov.uk/made-and-confirmed-plans

    Amendment DetailsDate Drw'n Chk'd App'd Date Date Date Date Drawing Number Revision Scale Designed Drawn Checked Approved Drawing Title Project Title Drawing Status A3 Sweco 2nd Floor, Quay 2 139 Fountainbridge Edinburgh EH3 9QG Tel: +44 (0)131 550 6300 Web: www.sweco.co.uk Quartermile For Information The Haymarket Stopped Up Boundary Revision 2 Location Plan 1:500 RE 07.06.22 RE 07.06.22 GK 07.06.22 GK 07.06.22 121828_SK100 Area which requires to be stopped up D A L R Y R O A D M O R R I S O N S T R E E T 5 4 3 2 INTERSECTION OF PROJECTED MORRISON STREET AND DALRY ROAD KERBLINE 1 1.

    https://www.edinburgh.gov.uk/downloads/file/33995/made-and-confirmed-plans
  • 1

    In the event of the post being affected by any restructuring or reorganisation leading to redeployment and/ or, redundancy, the Branch Official will be treated the same as any other employee whose substantive posts are similarly affected.... During the period of funded facility time the Trade Union will be responsible for the payment of all travelling and subsistence expenses. 10 Approved 6 August 2013 Revised January 2015 10.12 A Branch Official can work up to 10 Keeping In Touch Days (KIT days) during their period of funded facility time, without bringing their facility time to an end or extending its length. 10.13 The days can be used in a single block or separately for any activity that helps keep an employee informed and involved with events happening in the workplace, for example undertaking normal duties or a work project, attending team meetings or training/development events etc. 10.14 The use of KIT days is optional; a manager cannot insist that an employee carries out any work during the period of funded facility time and an employee cannot insist on being given work to do.... In the event of a failure to reach agreement both parties reserve the right to terminate this local agreement by giving four months notice in writing.

    https://www.edinburgh.gov.uk/downloads/file/26895/agreement-on-time-off-and-provision-of-facilities-for-trade-union-representatives
  • Https://www.edinburgh.gov.uk/city-plan-2030-proposals-map-north-east

    F 1:15,000 North East Env 1-12, Env 14-17, Env 19-21, Env 23-38, Inf 1-8, Inf 10, Inf 12, Inf 14 Inf 16, Inf 18-19, Inf 21-22, Re 1, Re 7- 8, Re 11, Hou 2-9, Econ 1, 3, 7 The City of Edinburgh Council Boundary General plan - wide policies Inf 3, Inf 4, Inf 11, Table 4Active Travel Proposals relating to Development sites Inf 3, Inf 4, Inf 10,Table 5Active Travel Safeguards - local connections/Entry points k Active Travel Mobility HubQ Inf 6 – 8, Inf 12, Tables 4, 8 Exisiting Tram Route Inf 3-4, Inf 11,Table 7 Public Transport Other Safeguards (PTSG 1-3) Inf 3, Inf 4, Inf 11, Table 10 Tram route safeguard proposal and option safeguards Inf 11, Table 7 Local Nature Reserve Env 21 International and National Natural Heritage Designation (Natura 2000 Site and/or SSSI) Env 21 Designated Conservation Area Env 13, Env 14 Env 16Scheduled Ancient Monument (including Union Canal) Env 15Historic Garden / Designed Landscape - Inventory Site Env 18Green Belt !

    https://www.edinburgh.gov.uk/downloads/file/32413/city-plan-2030-proposals-map-north-east
  • Stage 4 Report ( Action Plan ) – Draft

    The findings in this report conclude that the AQMA is still valid, taking account of proposed local development plans.... This scheme is currently operational on the eastbound carriageway. 4.1 Planning, development and policy considerations The role of the planning process and the implications of development plans for air quality management in Edinburgh are documented in the council’s Action Plan.... Further charts for the remaining sites, which illustrate a similar pattern are detailed in the Action Plan.

    https://www.edinburgh.gov.uk/downloads/file/22811/round-1-review-and-assessment-of-air-quality-stage-4
  • Https://www.edinburgh.gov.uk/updated-low-emission-zone-integrated-impact-assessment-iia-the-city-of-edinburgh-council-october-2021

    Risk from cumulative impacts Cumulative impacts may come about as a result of the City Mobility Plan, Edinburgh City Centre Transformation and City Plan 2030 policies which are being developed in parallel with LEZ.... The impact on overseas visitors is likely to be more prevalent when visitor numbers are higher for large cultural events.... Please provide a summary of the communications plan.

    https://www.edinburgh.gov.uk/downloads/file/30525/updated-low-emission-zone-integrated-impact-assessment-iia-the-city-of-edinburgh-council-october-2021
  • Https://www.edinburgh.gov.uk/updated-low-emission-zone-integrated-impact-assessment-iia-the-city-of-edinburgh-council-october-2021-

    Risk from cumulative impacts Cumulative impacts may come about as a result of the City Mobility Plan, Edinburgh City Centre Transformation and City Plan 2030 policies which are being developed in parallel with LEZ.... The impact on overseas visitors is likely to be more prevalent when visitor numbers are higher for large cultural events.... Please provide a summary of the communications plan.

    https://www.edinburgh.gov.uk/downloads/file/30525/updated-low-emission-zone-integrated-impact-assessment-iia-the-city-of-edinburgh-council-october-2021-
  • Https://www.edinburgh.gov.uk/updated-low-emission-zone-integrated-impact-assessment-the-city-of-edinburgh-council-march-2022-

    Risk from cumulative impacts Cumulative impacts may come about as a result of the City Mobility Plan, Edinburgh City Centre Transformation and City Plan 2030 policies which are being developed in parallel with LEZ.... The impact on overseas visitors is likely to be more prevalent when visitor numbers are higher for large cultural events.... Please provide a summary of the communications plan.

    https://www.edinburgh.gov.uk/downloads/file/30869/updated-low-emission-zone-integrated-impact-assessment-the-city-of-edinburgh-council-march-2022-