Search results

You searched for plan event

Results 7141 – 7150 of about 7972.

Refine by:

  • All results
  • Https://www.edinburgh.gov.uk/st-ninians-primary-2010

    Staff planned for learning effectively and responded well to children’s interests.... Very good progress had been made with the introduction of personal learning planning over the last two years.... The current improvement plan had had a positive impact on the work of the school.

    https://www.edinburgh.gov.uk/downloads/file/22402/st-ninians-primary-2010
  • Https://www.edinburgh.gov.uk/st-josephs-rc-primary-2013

    Subsequently the school with support from the education authority ensured the school improvement plan took account of the findings of the inspection.... Class work was planned to develop skills in all types of writing, including functional, imaginative and personal.... The revised social studies themes offered scope for personalisation and choice and teachers were encouraged to include learners as part of the planning process.

    https://www.edinburgh.gov.uk/downloads/file/22399/st-josephs-rc-primary-2013
  • Https://www.edinburgh.gov.uk/equality-framework-summary-2021-25

    What is planned to support the priority outcome?... It will benefit children with disabilities, families living in poverty and people from a Black, Asian or minority ethnic background What is planned to support the priority outcome?... What is planned to support the priority outcomes?

    https://www.edinburgh.gov.uk/downloads/file/30485/equality-framework-summary-2021-25
  • Https://www.edinburgh.gov.uk/corstorphine-town-centre

    Where a unit is used as a shop, it is necessary to get planning permission to change to a non-shop use.... We have produced Guidance on what changes of use are permitted and when an application for planning permission will be required.... Planning and Transport, PLACE.

    https://www.edinburgh.gov.uk/downloads/file/26308/corstorphine-town-centre
  • 139 Gogarburn entry.indd

    Proposed designs for the development of a campus-style global HQ were unveiled in February 2002, and in September 2002 planning permission was granted.... Stables and Estate Offices Rubble-built L-plan range to the north-west of Gogarburn House, converted to hospital use early in Gogarburn Hospital period.... Photographic copy of section and plan of site. 1930-33.

    https://www.edinburgh.gov.uk/downloads/file/23030/gogar-burn
  • 199 Dreghorn entry.indd

    Unfortunately these plans seem to have been curtailed by the World War II.... Guard House (Building 1) Single-storey, original block H-plan. 7-bay principal elevation to E.... Two-storey, T-plan farmhouse to east, two-storey cartsheds with haylofts to north and west, single storey byre to south, and later L-plan barn to south of byre.

    https://www.edinburgh.gov.uk/downloads/file/23022/dreghorn-castle-and-barracks
  • ROADS (SCOTLAND) ACT 1984

    marked A1 on the attached plans) b) All that part of the carriageway on the south-east side of Drylaw Crescent at House O’Hill Road from a point 2.2 metres or thereby south-west of the extended north-east building line of no.55 Drylaw Crescent southwards then eastwards to a point 8.5 metres or thereby west of the property boundary of No.19 and No.21 Telford Road and which has a width that varies from 0 metres or thereby to 5.9 metres or thereby.... marked A2 on the attached plans) c) All that part of the carriageway on the north-west side of House O’Hill Road at Telford Road from a point 13 metres or thereby south-east of the extended south-east property boundary of Blackhall Mosque southwards then westwards to a point 20 metres or thereby east of the property boundary of No.15 Telford Road and which has a width that varies from 0 metres or thereby to 5.5 metres or thereby.... marked A3 on the attached plans) All as the lengths of roads are shown in sawtooth hatching on the plan annexed and executed as relative to the Order.

    https://www.edinburgh.gov.uk/downloads/file/34074/draft-order
  • 200423 Response to CEC re VPS CAT

    As a registered charity and a Newhaven community organisation, Newhaven Heritage would like to express its grave reservations for the proposed plan to transfer the asset of the Victoria Primary School buildings and site to the ‘Heart of Newhaven’ organisation.... But beyond this, ‘Heart of Newhaven’s business plan is not consistent with what they as an organisation undertook to deliver: one and a half rooms does not constitute a ‘community hub’.... Indeed, the community hub agenda has entirely disappeared, according to the business plan that has been promoted for community asset transfer.

    https://www.edinburgh.gov.uk/downloads/file/27249/newhaven-heritage-society-response-to-cat-notice
  • Https://www.edinburgh.gov.uk/roseburn-to-union-canal-update-june-2024

    If you would like the leaflet in another format such as Braille, large print or translation, please contact the Interpretation and Translation Service email its@edinburgh.gov.uk quoting reference 23-8317a June 2024 Welcome to the newsletter for the Roseburn to Union Canal active travel project with information and updates on project activity and planned work.... This is due to other vital work taking place in the area and it taking a bit longer than expected to finalise plans for the bridge over the Mid Calder railway line.... Community engagement We are planning to hold a session later this summer with community groups and organisations to look at ways of involving them in plans for the community gardens.

    https://www.edinburgh.gov.uk/downloads/file/35151/roseburn-to-union-canal-update-june-2024
  • ll37a

    ll37a 11/10/23 PO/22/01 Page 1 of 2 TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 THE CITY OF EDINBURGH COUNCIL (DALRY ROAD & MORRISON STREET, EDINBURGH) (STOPPING UP) ORDER 2023 - PO/22/01 The City of Edinburgh Council, in exercise of the powers conferred on them by section 207 of the Town and Country Planning (Scotland) Act 1997, (“the 1997 Act”) and of all other powers enabling them in that behalf, and being satisfied that it has become necessary to authorise the Stopping Up of the lengths of road specified in the Schedule to this Order to enable development to be carried out in accordance with planning permission granted under Part III of the 1997 Act, and having complied with the provisions of Section 209 of and Schedule 16 to the 1997 Act, hereby make the following Order:- 1.... All as the said lengths of road are shown hatched on the plan and executed as relative to this Order.

    https://www.edinburgh.gov.uk/downloads/file/33993/made-and-confirmed-order