Search results

You searched for plan event

Results 7931 – 7940 of about 7984.

Refine by:

  • All results
  • Https://www.edinburgh.gov.uk/whec-workshop-thursday-8-february-2018

    ▪ The group stated that there is an assumption in these plans that goes against small schools, but there is evidence that small schools achieve as well. 10 Wester Hailes Education Centre: Workshop held on Thursday 8 February 2018 Discussion Group Three Item Discussion / Comments Summary of Published Proposals: WHEC would amalgamate with Currie Community High School in August 2022 upon the completion of a new South West Edinburgh High School

    https://www.edinburgh.gov.uk/downloads/file/22489/whec-workshop-thursday-8-february-2018
  • Notice of meeting and agenda

    City of Edinburgh Council, 11 March 2010 • The City of Edinburgh Council: Preventative Services in Adult Social Care, Health, Social Care and Housing Committee, 13 December 2011 The City of Edinburgh Council: The Edinburgh Partnership Prevention Strategic Plan 2015-18 Equalities and impact assessment 8.1 For details of the completed Record of Equality and Rights Impact Assessment (ERIA) form, contact the named author of the policy.

    https://www.edinburgh.gov.uk/downloads/file/25078/eligibility-criteria-policy---december-2015
  • Advisory Cycle Lanes L3

    Underlying services Plans of underlying service utilities should be consulted when undertaking placement.

    https://www.edinburgh.gov.uk/downloads/file/24977/p3---footways---version-11
  • Https://www.edinburgh.gov.uk/emissions-analysis-for-low-emission-zones-edinburgh-scottish-environmental-protection-agency-may-2021-

    As part of our recovery plan, SEPA implemented a phased rollout programme to restore critical services, re-establish critical communication systems to continue providing our priority regulatory, monitoring, flood forecasting and warning services.... The traffic models incorporate committed future City Centre Transformation (CCT) plans for the LEZ scenarios, such as closing Bank Street to general traffic. 5 OFFICIAL – BUSINESS Assumptions: The analysis and results in this report assume all Taxis and Buses are LEZ compliant across the whole city.

    https://www.edinburgh.gov.uk/downloads/file/30518/emissions-analysis-for-low-emission-zones-edinburgh-scottish-environmental-protection-agency-may-2021-
  • UK Parliamentary Election 2024: Guidance on activity in and around polling places

    Neighbourhood planning and business referendums in England 

    https://www.edinburgh.gov.uk/documents/uk-parliamentary-election-2024-guidance-activity-around-polling-places/14
  • Https://www.edinburgh.gov.uk/made-order

    In Article 6-3 (a) After all the words in item (8) there were inserted the words: - “ (9) in the case of a garage services permit, at the expiry of the period specified thereon (which period shall not exceed a period of twelve months from the date on which it was granted) or on the occurrence of any of the events set out in sub-paragraph (13) of paragraph (d) of Article 6-4, whichever is the earlier.”.

    https://www.edinburgh.gov.uk/downloads/file/32653/made-order
  • Advisory Cycle Lanes L3

    As a key design requirement, vehicle tracking will be supplied with supporting documentation for all planning applications Minor Street Strategic Secondary Local Place Type R/NF IE LDR MDR HDR SSE R/HS R/NF IE LDR MDR HDR SSE R/HS R/NF IE LDR MDR HDR SSE R/HS Major Street Type Strategic 9 6 6 (3) 9 9(6) 6(3) 6 (3) 9(6) 6(3) 3(1)Secondary Local 9(3) LDR – Low Density Residential MDR – Medium Density Residential HDR – High Density Residential Key: R/NF – Rural Road / No Frontage IE – Industrial Employment SSE – Service Sector Employment R/HS – Retail / High Street Maximum corner radii (desirable in brackets) Use of full carriageway width Use of the full carriageway width to turn will be appropriate in all local and, in most cases, secondary streets where: • speed limits are 30mph or less; • vehicle flows on the main street are moderate; and/or • large vehicles are expected to make turns infrequently (e.g.

    https://www.edinburgh.gov.uk/downloads/file/24968/g6---speed-reduction-and-traffic-management
  • Priority Junctions

    Drainage • Use CCTV drainage surveys to determine drainage design where extensive changes are planned

    https://www.edinburgh.gov.uk/downloads/file/24969/g7---priority-junctions---version-11
  • Https://www.edinburgh.gov.uk/rso-21-08-advert

    A copy of the proposed order and the accompanying plans showing the roads over which the means of exercise of the public right of passage are to be redetermined, together with a statement of the reasons for making the order have been deposited at the City of Edinburgh Council, Waverley Court reception, 4 East Market Street, Edinburgh and online at www.edinburgh.gov.uk/trafficorders and www.tellmescotland.gov.uk those documents are available for inspection free of charge from 19/04/2024 until 17/05/2024 between 09:30 and 15:30 Mon to Fri inclusive.

    https://www.edinburgh.gov.uk/downloads/file/34819/rso-21-08-advert
  • Microsoft Word - Overprovision Report to Edinburgh Licensing Board 14 Nov 2011.doc

    Neighbourhood Partnership area – there are 12 in the City that form part of the community planning structure. 4.

    https://www.edinburgh.gov.uk/downloads/file/23341/nov-2011-nhs-lothian-report-to-board-overprovision