Search results

You searched for plan event

Results 7941 – 7950 of about 7984.

Refine by:

  • All results
  • Advisory Cycle Lanes L3

    As a key design requirement, vehicle tracking will be supplied with supporting documentation for all planning applications Minor Street Strategic Secondary Local Place Type R/NF IE LDR MDR HDR SSE R/HS R/NF IE LDR MDR HDR SSE R/HS R/NF IE LDR MDR HDR SSE R/HS Major Street Type Strategic 9 6 6 (3) 9 9(6) 6(3) 6 (3) 9(6) 6(3) 3(1)Secondary Local 9(3) LDR – Low Density Residential MDR – Medium Density Residential HDR – High Density Residential Key: R/NF – Rural Road / No Frontage IE – Industrial Employment SSE – Service Sector Employment R/HS – Retail / High Street Maximum corner radii (desirable in brackets) Use of full carriageway width Use of the full carriageway width to turn will be appropriate in all local and, in most cases, secondary streets where: • speed limits are 30mph or less; • vehicle flows on the main street are moderate; and/or • large vehicles are expected to make turns infrequently (e.g.

    https://www.edinburgh.gov.uk/downloads/file/24968/g6-speed-reduction-and-traffic-management
  • Priority Junctions

    Drainage • Use CCTV drainage surveys to determine drainage design where extensive changes are planned

    https://www.edinburgh.gov.uk/downloads/file/24969/g7-priority-junctions-version-1-1
  • Inspection Template

    Email licensing@edinburgh.gov.uk Record of House of Multiple Occupation Inspection Reference 0 Documents Item Outcome Notes 1 Plans of the property that are representative of the layout and room use 2 Landlord’s record of gas safety inspection and/or installation certification 3 Electrical installation condition report and/or electrical installation certificate 4 Record of portable appliance testing and/or receipt/invoice for landlord supplied items 5 Record of emergency lighting testing and/or installation certificate 6 Record of fire appliance testing and/or receipt/invoice appliances 7 Fire Alarm System test certificate for systems covered by BS 5839-1. 8 Sprinkler System Inspection Certificate in accordance with BS9251 9 Fire Safety Risk Assessment 10 Installation and commissioning certificate for fire alarm system mailto:licensing@edinburgh.gov.uk Record of House of Multiple Occupation Inspection Reference 0 Building Warrants Building Warrant Number Issue Notes 1 2 3 4 5 6 7 8 9 10 City of Edinburgh Council, Licensing Service, City Chambers, High Street, Edinburgh, EH1 1YJ.

    https://www.edinburgh.gov.uk/downloads/file/27001/inspection-template
  • Bus Stops

    Any existing installations should be replaced during planned renewal works.

    https://www.edinburgh.gov.uk/downloads/file/24985/pt-2---bus-stops
  • Placing in School Procedures for new P1 & S1 Intake

    It is important that you register your child for school, even if you do not want your child to attend the catchment school, or if you plan to defer for a year.

    https://www.edinburgh.gov.uk/placinginschools
  • Https://www.edinburgh.gov.uk/corporate-charging-policy

    Determining the partial recovery of costs in these circumstances will need careful consideration and the relevant service should seek Executive Committee approval when proposing significant amendments. 1.5.5 Setting Charges 8 • The introduction of new charges or material changes to existing charges should be brought forward for consideration alongside the development / review of corporate and service priorities as part of the annual corporate and financial planning process.

    https://www.edinburgh.gov.uk/downloads/file/26381/corporate-charging-policy
  • Microsoft Word - Overprovision Report to Edinburgh Licensing Board 14 Nov 2011.doc

    Neighbourhood Partnership area – there are 12 in the City that form part of the community planning structure. 4.

    https://www.edinburgh.gov.uk/downloads/file/23341/nov-2011-nhs-lothian-report-to-board---overprovision
  • Bus Stops

    Any existing installations should be replaced during planned renewal works.

    https://www.edinburgh.gov.uk/downloads/file/24985/pt-2-bus-stops
  • Https://www.edinburgh.gov.uk/cleaner-air-for-scotland-–-national-modelling-framework-low-emission-zone-evidence-report-–-edinburgh-scottish-environment-protection-agency-september-2021

    As part of our recovery plan, SEPA implemented a phased rollout programme to restore critical services, re-establish critical communication systems to continue providing our priority regulatory, monitoring, flood forecasting and warning services.... Since July 2021, SEPA’s air modelling capacity has been restored and the modelling data for Edinburgh has been recovered successfully, though this has still resulted in a significant delay to work plans.... The LEZ rules were also considered when planning this stage of the modelling work.

    https://www.edinburgh.gov.uk/downloads/file/30519/cleaner-air-for-scotland-–-national-modelling-framework-low-emission-zone-evidence-report-–-edinburgh-scottish-environment-protection-agency-september-2021
  • Https://www.edinburgh.gov.uk/cleaner-air-for-scotland-national-modelling-framework-low-emission-zone-evidence-report-edinburgh-scottish-environment-protection-agency-september-2021-

    As part of our recovery plan, SEPA implemented a phased rollout programme to restore critical services, re-establish critical communication systems to continue providing our priority regulatory, monitoring, flood forecasting and warning services.... Since July 2021, SEPA’s air modelling capacity has been restored and the modelling data for Edinburgh has been recovered successfully, though this has still resulted in a significant delay to work plans.... The LEZ rules were also considered when planning this stage of the modelling work.

    https://www.edinburgh.gov.uk/downloads/file/30519/cleaner-air-for-scotland-national-modelling-framework-low-emission-zone-evidence-report-edinburgh-scottish-environment-protection-agency-september-2021-