Search results

You searched for tỷ lệ aff cup-✔️SIEUCACUOC.NET✔️Top nhà cái bóng đá, casino uy tín, thành viên mới tặng ngay 100k

Results 1051 – 1060 of about 1747.

Refine by:

  • All results
  • Https://www.edinburgh.gov.uk/ccwel/section-three-general-arrangements

    A N D R E W S TR E E T 5.86 6.09 1.5 3.47 1.5 4.1 4.00 4.14 TR TR TR TR TR SHEE T 3.3 SHEE T 3.4 SHEE T 3.2 S T A N D R E W S Q U A R E ST A NDRE W SQ UARE N O R TH S T D A V ID S TR E E T THIS TLE S TREE T 3.4 3.6 3.2 3.4 3.2 2.2 3.4 1.5 B O LT D O W N B A C K T O B A C K K E E P L E FT S IG N F A C E W E E B O L B O LL A R D O R S IM IL A R N E W T R A FF IC S IG N A L C O N TR O LL E R TE M P O R A R Y A S P H A LT R A M P F O R M O B IL IT Y IM P A IR E D A C C E S S T O C R O S S IN G S A D H E S IV E T R A M LI N E T A C TI LE S IN C O N TR A S TI N G G R E Y C O LO U R A D H E S IV E B LI S TE R T A C TI LE S IN C O N TR A S TI N G G R E Y C O LO U R A D H E S IV E T R A M LI N E T A C TI LE S IN C O N TR A S TI N G G R E Y C O LO U R B O LT D O W N K E E P L E FT S IG N F A C E W E E B O L B O LL A R D O R S IM IL A R IC G V LP LP LP LP C TV IC IC IC IC IC IC R S R S M K M K TL TL TL TLTL TL TL TL TL BUS STO P 34 C PE ST ANDREW SQUARE TH IS TLE S TR E E T 3.4 3.6 3.2 3.4 3.22.2 3.4 1.5 BOLT DOWN BACK TO BACK KEEP LEFT SIGN FACE WEEBOL BOLLARD OR SIMILAR NEW TRAFFIC SIGNAL CONTROLLER TEMPORARY ASPHALT RAMP FOR MOBILITY IMPAIRED ACCESS TO CROSSINGS ADHESIVE TRAMLINE TACTILES IN CONTRASTING GREY COLOUR ADHESIVE BLISTER TACTILES IN CONTRASTING GREY COLOUR ADHESIVE TRAMLINE TACTILES IN CONTRASTING GREY COLOUR 4 SHELTER 3.25 1.5 3.25 3.25 3 2.5 TD D _636809_3.3_D R _C H _00_0003 BOLT DOWN KEEP LEFT SIGN FACE WEEBOL BOLLARD OR SIMILAR This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office © Crown copyright.

    https://www.edinburgh.gov.uk/ccwel/downloads/file/153/section-three-general-arrangements
  • Https://www.edinburgh.gov.uk/h-h-group-plc

    Yes / No Short Response Not Answered Explanation Not Answered IC E N I P R O J E C T S L IM IT E D O N B E H A L F O F H & H G R O U P P L C L a n d a t R ic c a rt o n , E d in b u rg h Iceni Projects Glasgow: 177 West George Street, Glasgow, G2 2LB Edinburgh: 11 Alva Street, Edinburgh, EH2 4PH London: Da Vinci House, 44 Saffron Hill, London, EC1N 8FH Manchester: This is the Space, 68 Quay Street, Manchester, M3 3EJ t: 020 3640 8508 | w: iceniprojects.com | e: mail@iceniprojects.com linkedin: linkedin.com/company/iceni-projects | twitter: @iceniprojects Land at Riccarton, Edinburgh Response to Choices for City Plan 2030 Iceni Projects Limited on behalf of H&H Group Plc April 2020 2 0 CONTENTS INTRODUCTION ......................................................................................................... 1 CONTEXT FOR ADDITIONAL GREENFIELD RELEASE .......................................... 2 SITE & SURROUNDINGS .......................................................................................... 6 DEVELOPMENT OPPORTUNITY .............................................................................. 8 RESPONSE TO GREENFIELD SITE ASSESSMENT ............................................. 11 CONCLUSION .......................................................................................................... 20 1 INTRODUCTION 1.1 This statement has been prepared by Iceni Projects on behalf of H&H Group Plc.

    https://www.edinburgh.gov.uk/downloads/file/27647/h-h-group-plc
  • Https://www.edinburgh.gov.uk/primus-riccarton-limited

    Yes / No Short Response Not Answered Explanation Not Answered Customer Ref: 01698 Response Ref: ANON-KU2U-GPHC-9 Supporting Info Name Callum Fraser (Iceni Projects) Email Cfraser@iceniprojects.com Response Type Agent / Consultant On behalf of: Primus Riccarton Limited A P R IL 2 0 2 0 IC E N I P R O J E C T S L IM IT E D O N B E H A L F O F P R IM U S R IC C A R T O N L IM IT E D L a n d W e s t o f R ic c a rt o n M a in s R o a d , E d in b u rg h R E S P O N S E T O C H O IC E S F O R C IT Y P L A N 2 0 3 0 Iceni Projects Glasgow: 177 West George Street, Glasgow, G2 2LB Edinburgh: 11 Alva Street, Edinburgh, EH2 4PH London: Da Vinci House, 44 Saffron Hill, London, EC1N 8FH Manchester: This is the Space, 68 Quay Street, Manchester, M3 3EJ t: 020 3640 8508 | w: iceniprojects.com | e: mail@iceniprojects.com linkedin: linkedin.com/company/iceni-projects | twitter: @iceniprojects Land West of Riccarton Mains Road, Edinburgh Response to Choices for City Plan 2030 Iceni Projects Limited on behalf of Primus Riccarton Limited April 2020 2 0 CONTENTS EXECUTIVE SUMMARY ............................................................................................. 1 SITE & SURROUNDINGS .......................................................................................... 2 COMMENTARY ON CEC’S GREENFIELD SITE ASSESSMENT ............................. 3 DEVELOPMENT PROPOSAL .................................................................................... 6 CHOICE 10 - CREATING SUSTAINABLE COMMUNITIES ....................................... 8 CONCLUSION .......................................................................................................... 12 1 EXECUTIVE SUMMARY 1.1 This statement has been prepared by Iceni Projects on behalf of Primus Riccarton Limited (Primus).

    https://www.edinburgh.gov.uk/downloads/file/27684/primus-riccarton-limited
  • Https://www.edinburgh.gov.uk/victoria-park-conservation-area-character-appraisal

    There are instances of turret slate roofs with ornate cast iron thistle finials on the top of the turrets.... However, all the houses feature striking ornamental cresting or brattishing on the top edge of the roof in different styles.... Many of the properties retain their original one over one-pane windows, with a smaller top pane. 18 Victoria park character appraisal The Dudleys originally had cast iron railings on the boundary wall and cast iron gates.

    https://www.edinburgh.gov.uk/downloads/file/23409/victoria-park-conservation-area-character-appraisal
  • Https://www.edinburgh.gov.uk/surface-water-management-and-flood-risk-guidance-march-2022

    The buffer strip should be measured from the top of the bank and the minimum widths stated below are required on each side of the watercourse.... Width of watercourse (measured between the top of banks) Minimum width of buffer strip (measured from either side of the watercourse top of bank) Less than 1m 6m 1-5m 6-12m 5-15m 12-20m Greater than 15m 20m+ 4.6.4 Sewers for Scotland (Scottish Water, 2018) guidance on building over or near a sewer should be applied to culverted watercourses. 4.7 Other Key Considerations 4.7.1 Daylighting of culverts is actively encouraged by CEC Flood Planning and SEPA to reduce flood risk and help to return the watercourse to its natural state.

    https://www.edinburgh.gov.uk/downloads/file/32775/surface-water-management-and-flood-risk-guidance-march-2022
  • Notice of meeting and agenda

    For the last few years, the top priority for tenants has been for the Council to build more homes.... Edinburgh is in the top three local authorities in Scotland for tenant satisfaction in relation to the housing service, quality of home and neighbourhood.... Annual and ongoing consultation has shown that building new affordable homes in the city remains a top priority for Council tenants.

    https://www.edinburgh.gov.uk/downloads/file/25760/city-housing-strategy-2018
  • Advisory Cycle Lanes L3

    Depending on the profile of the top surface, they may offer a greater deterrent to cyclists (particularly option 4.3).... A green verge/strip for trees, Utrecht Images: top and bottom left (LCDS, 2016), bottom and top right (The City of Edinburgh Council) Stand alone kerb, Copenhagen Hard surface buffer zone in Buccleuch Street, Edinburgh Hard surface area for cycle parking/ loading space or protection for pedestrians wanting to cross the road Illustrative London scheme http://content.tfl.gov.uk/streetscape-guidance.pdf Edinburgh Street Design Guidance : Part C – Detailed Design Manual Version: V1.0 2017 FactsheetC4 - Segregated Cycle Tracks: Hard Segregation - Kerbs and Other Separation Options Key considerations • Consistency of width of the cycle facility and of the adjacent general traffic lane... Cycle Gate at signal junctions 37 Indicative layout for cycle gate (London example) Cycle gate at Bow: (top) segregated approach and first cycle stop line, and (bottom) advanced cycle stop line.

    https://www.edinburgh.gov.uk/downloads/file/24958/c4-segregated-cycle-tracks-hard-segregation
  • Princes Street Gardens Management Plan

    The Top terrace in the East Gardens is Princes Street Gardens Management Plan 2017 – 2020 Page 14 of 68 the only popular area which is freely accessible at-grade to disabled people.... Princes Street Gardens Management Plan 2017 – 2020 Page 24 of 68  Terrace trees: formal planting along the top and mid terraces, and informal planting on the slope below... Threats  Continual use of heavy vehicles in East Gardens could cause structural damage to balustrade along top path and slopes down from path

    https://www.edinburgh.gov.uk/downloads/file/22597/princes-street-gardens-management-plan-2017---2020
  • Advisory Cycle Lanes L3

    Depending on the profile of the top surface, they may offer a greater deterrent to cyclists (particularly option 4.3).... A green verge/strip for trees, Utrecht Images: top and bottom left (LCDS, 2016), bottom and top right (The City of Edinburgh Council) Stand alone kerb, Copenhagen Hard surface buffer zone in Buccleuch Street, Edinburgh Hard surface area for cycle parking/ loading space or protection for pedestrians wanting to cross the road Illustrative London scheme http://content.tfl.gov.uk/streetscape-guidance.pdf Edinburgh Street Design Guidance : Part C – Detailed Design Manual Version: V1.0 2017 FactsheetC4 - Segregated Cycle Tracks: Hard Segregation - Kerbs and Other Separation Options Key considerations • Consistency of width of the cycle facility and of the adjacent general traffic lane... Cycle Gate at signal junctions 37 Indicative layout for cycle gate (London example) Cycle gate at Bow: (top) segregated approach and first cycle stop line, and (bottom) advanced cycle stop line.

    https://www.edinburgh.gov.uk/downloads/file/24958/c4---segregated-cycle-tracks---hard-segregation
  • Https://www.edinburgh.gov.uk/procurement-annual-report-2019

    Council expenditure with third parties 7.4 In the period of the report the Council expenditure with third parties in 2018/19 was: ➢ £634,836,888 7.5 The third party spend has increased by 18% compared to last year (£539,998,897 in 2017/18), this is reflected in the category summary below, based on the Council’s top 20 suppliers (by value of spend), where construction spend has increased from £63m in 2017/18 to £81.7m in 2018/19.... In the recent Local Government benchmarking report for 2017/18 the Council procurement spend with SMEs was ranked 6th in Scotland. 7.7 The supplier spend categories cover around 30 different description types (e.g. construction, professional services and so on) a summary of category spend with our top 20 Suppliers is presented below in Figure 1 and remains largely unchanged from last year Figure 2.... It is a toolkit for contract management activities throughout a contract’s lifecycle and has a strong focus on supplier management and compliance; ➢ Contract management framework was co-produced with corporate teams across the Council (including Risk, Resilience, Information Governance, Health and Safety and Internal Audit) as well as contract managers The CAGM team lead on delivering operational efficiencies, reviewing the Council’s top suppliers, securing better outcomes, best value and improved performance; Partially Complied 23 1.

    https://www.edinburgh.gov.uk/downloads/file/29830/procurement-annual-report-2019