Search results

You searched for tỷ lệ aff cup-✔️SIEUCACUOC.NET✔️Top nhà cái bóng đá, casino uy tín, thành viên mới tặng ngay 100k

Results 1231 – 1240 of about 1747.

Refine by:

  • All results
  • Https://www.edinburgh.gov.uk/vision-for-water-management-in-the-city-of-edinburgh

    Without adaptation, increasing impermeable surfaces has potential to increase flood flows in our watercourses on top of that caused by climate change.

    https://www.edinburgh.gov.uk/downloads/file/30101/vision-for-water-management-in-the-city-of-edinburgh
  • Microsoft Word - 10243 2018 EPS Questionnaire 100918 FINAL.docx

    SHOWCARD C] Very satisfied Fairly satisfied Neither satisfied nor dissatisfied Fairly dissatisfied Very dissatisfied No opinion Q2 What should be the top priority for improving the quality of life in your neighbourhood?

    https://www.edinburgh.gov.uk/downloads/file/23823/eps-2018-questionnaire
  • Https://www.edinburgh.gov.uk/appendix-5-commitment-to-partnership-working

    Jed Milroy The History of Education Centre​ has been providing a valuable and engaging service for over 30 years are always in the Top Ten places to visit on Doors Open Day each September when classes are run throughout the day.

    https://www.edinburgh.gov.uk/downloads/file/27119/appendix-5-commitment-to-partnership-working
  • Https://www.edinburgh.gov.uk/sustainable-rainwater-management-guidance-factsheet-w3-rain-gardens

    Greener Grange Town Rain Garden Planting | Arup FactsheetW3- Rain Gardens V.2Sustainable Rainwater Management Guidance 8 Maintenance Typical Maintenance Requirements for Rain Gardens Water new planting regularly in dry periods during establishment • 1 year for meadow grasses and short-lived perennials • 2 years for perennials and small shrubs • 3- 5 years for trees and large shrubs Weekly or as required between spring and Autumn Inspect regularly 3-6 months Water established vegetation during prolonged dry periods As required Clear litter and leaf debris from water inlet channels and mulch Annually (late November) or as required depending on location and amount of litter Replace or top up mulch layer (if used) Annually or as required Manage vegetation including replacement or reseeding of dead or damaged plants As required to maintain attractive healthy planting, allow for pruning back shrubs in autumn if required Remove self -seeded invasive species and woody seedlings Every 3- 6 months Scarify and spike topsoil to improve infiltration and break up silt deposits 5 yearly or as required Removal of silt build up to restore capacity (and if necessary, replant or reseed) 5 yearly or as required Technical references: • CIRIA The SUDS Manual (C753), Chapter 18: Bioretention Areas, p332 • Guidance on the construction of SuDS C768, Chapter 31: Bioretention , p186 Routine maintenance of rain gardens will include vegetation or grass management, annual removal of debris, clearing of inlets and the periodic removal of silt (if required).

    https://www.edinburgh.gov.uk/downloads/file/30100/sustainable-rainwater-management-guidance-factsheet-w3-rain-gardens
  • Https://www.edinburgh.gov.uk/apply-for-permission-to-use-a-crane-to-erect-a-tower-crane

    Leith Street (part) That part of the road extending approximately Southwest from the top of Leith Walk to a point approximately 75 metres Northeast of the extended Northeast kerbline of Greenside Row.

    https://www.edinburgh.gov.uk/downloads/file/23633/apply-for-permission-to-use-a-crane-to-erect-a-tower-crane
  • Https://www.edinburgh.gov.uk/apply-for-permission-to-excavate-in-a-public-street

    Leith Street (part) That part of the road extending approximately Southwest from the top of Leith Walk to a point approximately 75 metres Northeast of the extended Northeast kerbline of Greenside Row.

    https://www.edinburgh.gov.uk/downloads/file/23625/apply-for-permission-to-excavate-in-a-public-street
  • Https://www.edinburgh.gov.uk/apply-for-permission-to-operate-mobile-cranes-hoists-or-cherry-pickers

    Leith Street (part) That part of the road extending approximately Southwest from the top of Leith Walk to a point approximately 75 metres Northeast of the extended Northeast kerbline of Greenside Row.

    https://www.edinburgh.gov.uk/downloads/file/23628/apply-for-permission-to-operate-mobile-cranes-hoists-or-cherry-pickers
  • Sheet 1 of 4

    PROPOSED CYC LE LANE DEFEN DER (Fig 1.)

    https://www.edinburgh.gov.uk/downloads/file/29159/causewayside-1
  • M&G CACA.indd

    Human scale is provided by the clear vertical rhythm expressed in the elevational composition, the picturesque roof profi le, widths of bay windows with low sills, continuous individual and shared access doors fl anked by a regular pattern of grouped windows and small enclosed front gardens.

    https://www.edinburgh.gov.uk/downloads/file/23385/merchiston-greenhill-conservation-area-character-appraisal
  • LPF Unaudited Annual Report and Accounts 2023/24

    Schemes will be expected to pay a top-up to receiving scheme with interest at Bank base rate +1%.... Schemes will be expected to pay a top-up to receiving scheme with interest at Bank base rate +1%.... Although investment income is below the annual pension outgoings, the all gilt investment strategy incorporates these cash flow requirements, with redemption dates of gilts tying into the fund's liquidity needs.

    https://www.edinburgh.gov.uk/downloads/file/27534/unaudited-annual-accounts-2022-23-lothian-pension-fund-and-scottish-homes-pension-fund