Search results

You searched for tỷ lệ aff cup-✔️SIEUCACUOC.NET✔️Top nhà cái bóng đá, casino uy tín, thành viên mới tặng ngay 100k

Results 1511 – 1520 of about 1747.

Refine by:

  • All results
  • Practitioner TOOLKIT

    Treatment Outcome Profile (TOP) TOP is a tool which measures change and progress in five key domains: substance use, injecting risk behaviour, crime, health and quality of life.... TOP has been adopted as an outcome tool by most drug services in England and Wales.... Julie has a ‘medicine box’ for her methadone (70 mls daily) and keeps this in a top shelf in her bedroom wardrobe.

    https://www.edinburgh.gov.uk/downloads/file/23063/capsm-practitioner-s-toolkit
  • Edinburgh SDCF needs assessment and feasibility study FINAL

    Findings from an Evalua.on of London’s Temporary Overdose Preven.on Site (TOPS).... Table 13 lists the top ten beat areas with the highest number of total incidents in 2021 and 2022, alongside the ward and locality that corresponds to the beat area.... It's not the top of my list.

    https://www.edinburgh.gov.uk/downloads/file/34563/edinburgh-sdcf-needs-assessment-and-feasibility-study-report
  • Https://www.edinburgh.gov.uk/taylor-wimpey-east-scotland

    Conclusion 4.3 This report has assessed the transport and access issues surrounding the allocation of the site for residential development and a review of these issues has demonstrated that there are no transport reasons why the site could not be so allocated in the upcoming LDP. 13 APPENDIX A FIGURES 14 APPENDIX B SKETCHES M A R C H 2 0 2 0 IC E N I P R O J E C T S L IM IT E D O N B E H A L F O F T A Y L O R W IM P E Y E A S T S C O T L A N D L a n d a t N o rt o n M a in s , R a th o R E S P O N S E T O C H O IC E S F O R C IT Y P L A N 2 0 3 0 Iceni Projects Glasgow: 177 West George Street, Glasgow, G2 2LB Edinburgh: 11 Alva Street, Edinburgh, EH2 4PH London: Da Vinci House, 44 Saffron Hill, London, EC1N 8FH Manchester: This is the Space, 68 Quay Street, Manchester, M3 3EJ t: 020 3640 8508 | w: iceniprojects.com | e: mail@iceniprojects.com linkedin: linkedin.com/company/iceni-projects | twitter: @iceniprojects Land at Norton Mains, Ratho Response to Choices for City Plan 2030 Iceni Projects Limited on behalf of Taylor Wimpey East Scotland March 2020 0 CONTENTS INTRODUCTION ......................................................................................................... 1 SITE & SURROUNDINGS .......................................................................................... 3 DEVELOPMENT OPPORTUNITY .............................................................................. 4 RESPONSE TO GREENFIELD SITE ASSESSMENT ............................................... 7 CONCLUSION .......................................................................................................... 15 1 INTRODUCTION 1.1 This statement has been prepared by Iceni Projects on behalf of Taylor Wimpey East Scotland.

    https://www.edinburgh.gov.uk/downloads/file/27701/taylor-wimpey-east-scotland
  • Https://www.edinburgh.gov.uk/saughton-park-cafe-ground-floor-plan

    ByDate DescriptionRevision -- a: 99 Giles Street > Edinburgh > EH6 6BZ t: 0131 553 4321 f: 0131 554 6699 e: architecture@sutherlandhussey.co.uk www.sutherlandhussey.co.uk Project SAUGHTON PARK CAFE BALGREEN ROAD EDINBURGH EH11 3BQ SUTHERLAND HUSSEY ARCHITECTS Proposed Cafe Ground Floor Plan Drawing Title Scale Date Dwg No Rev No © Sutherland Hussey Architects Status BUILDING WARRANT 1:50 GA-10 RG RG 18 18 2, 86 4 1, 70 3 2, 85 1 3,600 3,600 3,913 3,934 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 3, 91 2 3, 60 0 1, 68 5 1, 20 0 1, 20 0 1, 20 0 1, 20 0 1, 20 0 1, 20 0 1, 20 0 1, 20 0 8951,200 89 5 1,2001,2001,2001,2001,2001,2001,2001,2001,2001,2001,200 3,600 3,600 3,600 3, 93 5 24 7 1, 93 2 3, 60 0 1, 77 5 2,200 1, 65 0 822 830 830 1,363 1, 60 0 1,200 1, 60 0 95 0 1, 35 0 393700700 600 600 600 600 600 600 2,0721,5301,8701,036 3,886 6,000 6,000 5,380 4,024 231 75248 3,935 1,975 1, 98 4 3,934 2,552 3,200 3,200 3,200 3,200 6,238247 24 7 3,935 248 1851753,0253,2003,200153,1852,305 3,430 1,275 1,295 3,430 3,430 1,295 1,258 S O 130 1,920 1,810 79 3 1, 97 6 10 0 to c ol um n C L 65 12 5 3,700 815 1,090 ±0.000 -0.030±0.000 93.1° 90.0° 60.0° 60.0° 90.0° 90.0° S -0 6 E -2 0 E -2 0 Wall Type 01 Wall Type 01 Wall Type 01 Wall Type 01 Wall Type 01 Wall Type 01 Wall Type 03 Wall Type 03 Wall Type 03 E X D -03 W-19 W-21 48.93 48.90 48.90 48.90 48.90 48.90 48.9048.9348.93 48.90 48.90 48.70 48.93 48.93 48.90 48.90 48.90 48.90 48.90 48.93 48.93 Occ Load Factor 1.0 Occupancy: 90 Occ Load Factor 1.0 Occupancy: 22 Occ Load Factor 1.0 Occupancy: 35 dia 45 0 dia 45 0 dia 45 0 1800 x 2000 1500 x 1500 1170 x 750 dia 45 0 1500 x 1500 16 00 x 7 50 16 00 x 7 50 80 0 C le ar 80 0 C le ar 800 Clear 1170 x 750 1500 x 1500 ENTRANCE MATTING Trickle Ventilation: 70 000mm2 Min Openable Area: 3.6m2 Trickle Ventilation: 16 000mm2 Mechanically Ventilated Trickle Vent: 4000mm2 Min Openable Area: 0.12m2 TV 10 000 T V 1 0 00 0 T V 1 0 00 0 TV 10 000 TV 10 000 Trickle Ventilation: 12 400mm2 Min Openable Area: 0.44m2 Trickle Ventilation: 12 400mm2 Min Openable Area: 0.44m2 Trickle Ventilation: 11800mm2 Min Openable Area: 0.39m2 Trickle Ventilation: 20200mm2 Min Openable Area: 0.90m2 800 Clear No requirement for cavity barrier in roof space (room length 19.2m) 12.6m 800 Clear 800 Clear GATE 01 GATE 02 GATE 03 GATE 04 GATE 05 80 0 cl ea r 80 0 cl ea r Cafe Compartment Area Area: 169.5 m2 Toilets Compartment Area Area: 53.2 m2 Male Toilets R-18 Area: 11.8 m2 Female toilets R-14 Area: 13.3 m2 Changing Places WC R-13 Area: 13.2 m2 Unisex Staff WC R-07 Area: 2.3 m2 Unisex DIS WC R-06 Area: 4.7 m2 Unisex WC R-05 Area: 2 m2 Servery R-03 Area: 19.7 m2 Bothy R-20 Area: 35.1 m2 Cleaner R-17 Area: 1.9 m2 Disabled WC R-16 Area: 3.6 m2 Lobby R-15 Area: 6.7 m2 Cold Store R-10 Area: 3.6 m2 Office R-11 Area: 3.4 m2 Kitchen R-09 Area: 19.2 m2 Lockers R-08 Area: 2.4 m2 Cleaner R-02 Area: 1.9 m2 Plant Room R-12 Area: 9.5 m2 Lobby R-04 Area: 3.3 m2 Bin Store F: RC slab CA: 9.969 m2 S-06 S-06 F F H H A A J J 8 8 7 7 4 21 9 9 G G 3 10 10 11 11 12 12 C C D D E E 6 6 5 5 13 13 14 14 15 15 16 16 17 17 D1 D1 E1 E1 F1 F1 P P Q Q 3, 68 5 1,997 3,684 4, 60 0 600 1,199 1,829 1,726 1, 25 0 to C L B ea m 65 to C ol um n C L 65 to C ol um n C L 1, 65 0 13 0 3, 55 5 S-06 S-13 S-12 S-14 S-05 S-07 S-08 S -21 S -20 E-01 E-05 Wall Type 01 Timber Clad External Wall comprising 42x42mm western red cedar vertical battens screw fixed to 25x38mm horizontal battens at 400mm centres Solid timber stacked sleepers to match planter design 65mm Polished screed floor with underfloor heating on 200mm rigid Kingspan insulation on RC Floor to Engineer's specification Floor finish: Transparent matt concrete sealer with anti slip additive.... Operated by push pad Min Clear 800mm WALL TYPE B W A LL T Y P E B TY P E B W A LL T Y P E B W A LL T Y P E B WALL TYPE B W A LL T Y P E C WALL TYPE D W A LL T Y P E B W A LL T Y P E B W A LL T Y P E B W A LL T Y P E B WALL TYPE B W A LL T Y P E B W A LL T Y P E A CL BEAM OVER FW 12 GULLEY FW13 FW 05 FW 06 DW DWSINK AAV AAV AAV AAV AAV Vision Panel Required Vision Panel Required Entrance Door Fitted with concealed powered opener.

    https://www.edinburgh.gov.uk/downloads/file/22694/saughton-park-cafe-ground-floor-plan
  • Https://www.edinburgh.gov.uk/newhaven-south

    Play Area Shelter 4 8 12 4 39 2 21 4 78 49 47 17 3 50 Play Area PH 1 Old People's 31 2 86 to 9 0 12b 10 12a 51 El Sub Sta 16 17 to 2 3 15 3 AD M IR AL TY S TR EE T PH of Art 53 32 to 38 PCB 39 El Sub Sta 48 S he lte r 19 13 2 35 54 2 33 LARG O 23 to 31 9 t o 1 2 7 TH E Q U ILTS 21 25 1 Wynd Bo wl in g La ne 48 26 93 40 11.3m 6 14.6m 1 1 TH E Q UI LT S 10 25 1 3 40 8 38 26 12 47 Sluice Posts 41 28 LB 5 9.8m Shelter Port of Leith 8 7 150 1 3 4 101 P ortland Terrace 1 to 3 16 NORTH 6 to 8 148 18 t o 20 Portland Place NORTH LEITH PH 5.5m to 17 Hotel TCB 4. 9m 5 3 Electricity Distribution Site 34a Li nd sa y Pl ac e 13 SM El Sub Sta Hamilton Wynd Ps Fort He len 's W alk 12 40 38a 15 42 13 17 2 1 34 26 7 8 38 1 42a 1 1 6 5 Gas Gov 21 El Sub Sta ESS 2 Surgery 1 to 4 N O R TH L E IT H S A N D S 2 P O R TL A N D R O W 1 195 to 200 2 P O R TLA N D G A R D E N S O C E A N D R IV E Pumping Station SM 6 5 11/ 2 15 6.4m 1 SM 2 3 35 43 68 SM BATHFIELD 19 28 36 HILLHOUSEFIELD PR INC E R EG EN T S TR EE T 60 18 12 to 2 0 1625 2 7 15 8 14 NORTH LEITH SANDS 39 8.2m 50 6 25 25 8 21 to 24 13 23 32 28 24 55 10 to 1 3 1 18 LB 57 Hawthornvale Path 10 53 22 38 11 NORTH LINDSAY ROAD 29 37 40 14 14 13 Hall 6 5 to 7 Slo pin g m aso nry 38 27 72 34 LINDSAY ROAD 62 to 72 LEITH ARGYLE STREET 27 30 6 16 55 13 19 3 9 7 El Sub Sta 8.2m 3 20 12 2 1 23 to 31 North Leith 15 S M 20 12 47 8 5 20 26 8/1 23 2 9 12 1 18 74 17 42 26 24 8 22 16 LI N D SA Y ST R EE T 9 to 11 SM 33 13 21 7 Parish Church 21 18 to 20 9.1m 31 1 11 6 to 1 20 51 67 22 63 65 56 93 91 11 22 24 23 56 SM Shelter Shelter Play Area Shelter 12 to 14 PH 4 8/2 18 Hamburgh Place 21 9 SM 11.6m 14 PH 69 Bo lla rds 15 4 39 14 67 63 4 47 to 53 3 49 8 37 to 45 18 22 59 17 to 21 7 to 15 5 20/1 Keddie Gardens PL AC E 46 Bollard Slipway 17 16 14 Play Area 55 to 61 64 45 Trees 70St Nicholas Court 6 58 110 4042 8 20 21 ESS 33 27 41 33 31 28 123 70 13 11 35 PH 23 4 49 12 3 72 11 113 to 117 PO 34 to 3 6 Leith 1 5 78 1 152 to 162 89 to 95 3 32 109 TR A FA LG A R S TR E E T 169 to 173 97 Garage 150 2 145 92 S urgery 7 38 26 14.0m 102 15.2m 2 29c 16 31 2 139 to 145 37 137 29 b 122 18 134 to 142 120 119 9 7472 12 Baptist 8 Works 4 18 to 20 10 1 TRAF ALGA R LAN E 107 92 to 98 99 54 117 Warehouse 12.5m 1 to 3 103 20 5 57 51 FERR Y ROA D 90 27 5 to 7 PH 106 29 111 3 76 157 to 161 126 to 132 13.1m 149 124 G arage 21 to 2 3 14.6m 129 151 to 155 22 to 2 6 9 to 1 1 77 to 87 56 TCB Ward Bdy 118 94 Wate r of L eith Walk way PH PITT S TREET 28 137 4 8 to 12 9 29 a 105 2 131 163 to 167 55 Shelter 1 3 16 6 Shelter 52 14.6m Club 46 39 20 147 121 11 104 15 144 30 TCB 32 to 4 4 73 26 34 1 32 5 Church 11/ 1 HO PE FIE LD TE RR AC E 33 8 14 10 7 3 Home 33 65 9 36 10 /2 17 67 44 to 48 38 to 42 36 S urgery 34 12 1 41 to 4 9 27 to 2 9 37 35 13 69 28 15 31 to 3 9 10 /1 Fort Early Years Centre Cannon W ynd Cannon W ynd 101 105 G uardhouse Parade 20 27 40a 7 42b JO H N P AU L JO N ES V IE W JO HN PAUL JO NES VIEW 11 36a 10 29 32 2 8 20 32a 2 2 36 8 23 14 15 Community Centre 42c 27 14 39 LINDSAY STREET 17 108 1 3 5a 46 44 100 20 13 74 1 50 19 13 Surgery 98 5 32 23 10 24 7 14.6m 14 9 Bank Ind ust ry H om es 1 10 26 18 1 22 112 N O R TH FO R T STR EET 10 SM 30 95 H aw thornbank Terrace M ADEIRA STREET 31 7 15.2m N O R TH FO R T STR EET 4 45 52 77 12 PO RT LA ND S TR EE T 14.9m 87 36 SUM M ERSIDE PLACE 46 29 35 17 Sl op ing m as on ry 48 79 15.8m 1a LAP ICI DE PL AC E 42 Ward B dy 23 W ard B dy 25 11 17 12 21 DUDLEY AVENUE SO UTH 28 12 5422 103 97 1 1 54 49 51 37 21 221 13 52 50 47 88 4 86 14 2 to 1 IND US TR Y L AN E 11 12 39 2 8 30 MA DE IRA PL AC E ESSs L Twr Bollards Tk Western Harbour Posts Posts 100 Bollards El Sub Sta L Twr Bollards Bollards Bo lla rd s Chancelot Mill Store Port of Leith - Cruise Liner Terminal Conveyors MoPs L Twr Bollards MoPs L Twr L Twr TCB L Twr 23 21 23 3 30 19 68 21 60 Ballantyne Lane 16 42 22 4 Quilts 20 6 36 2 48 Sports Court LB 12 .5 m 57 to 6 3 to 49 52 27 13.7m 55 El Sub Sta 11.3m 2 49 11 10 51 N O R TH F O R T S TR E E T 3 Mast (telecommunication) Leith Theatre Leith Library 199 28 to 3 0 197 195 TCB 10 PH Bank 2 SM Schoo l 23 25 to 2 7 MILL 51 Leith 86 4 N O R TH JU N C TIO N S TR E E T N O R TH JU N C TIO N S TR E E T 11.9m 76 7.3m 43 35 11.0m 2 to 6 42 Persevere Court 28 to 38 13 14 12.8m 3735 22 to 30 37 20 TCB 11 PCB 5 88 60 62 128 73 Cycl e Pa th 111 to 115 8 100 90 144 El Sub Sta 73 37130 to 136 119 to 121 43 53 13 65 48 to 58 120 61 45 17 to 19 71 80 14 105 to 109 S O U TH FO R T S TR E E T 16 to 20 60 to 64 22 to 26 47 41 66 to 70 PH 16 86 40 to 46 75 1 3 78 to 8 4 BA LL AN TY NE R OA D 144 146 2 t o 1 4 5 to 9 42 18 50 14 4.9m 134 Sewage Pumping Station 1 to 5 Sub Sta 11.0m 21 21 a 110 7b Beacon 8.2m TR INI TY W AY 102 1 3 2 SPEN CER PLA CE M ean H igh W ater S prings M HW S W est B reakw ater FB M H W S Bollards 5.2m Springs B ol la rd s S loping m asonry M LW S Old Light House Mean Lo w Water Lighthouse (disused) B oulders Newhaven Harbour 5.2m 5.2m 51 to 5 3 Posts Sports Centre Post Hotel N ew ha ve n H ar bo ur Bo uld er s m as on ry W at er S pr ing s M ea n Lo w 24 Fish Market Sports Court Tennis Courts BollardsM H & M LW S Sl op ing 8 10 9 3 2 FB 7 Sports Facility S lip w ay W E S T C H E R R Y B A N K La m bs C ou rt W es te r C lo se Mean High Water Sprin gs Post Posts 9 45 43b LB 6 11 37 5 60 NEWHAVEN MAIN STREET 25 6 41 to 47 8.2m 35 4 4.3m 44 3 8.5m 12 5 1 FI S H M A R K E T Posts 42 4.9m Posts 5 1 6 S Q U A R E PH 21 2 1 3 2 3 25 6 Shelter Posts P os ts 3 PCB PIER PLACE 40 2 2 62 PIER PLAC E 6 SM 39 29 10 B E LV E D E R E P A R K 13 LA V E R O C K B A N K TE R R A C E 12 4 18.6m SM 32 TCB 1 PARK ROAD ANDRE W WOO D 26 37 5 43 1 6 ROA D 2 1 C R A IG H A LL R O A D 35 5 STANLE Y P A R K R O A D PARK PLACE 3 1 COURT 27 Manse 8 22 17 24 11 20 30 6 36 NEWHAVEN 20 14 23 17 3 to 8 9 5 10 10 12 1 11 4 South Park 17 STA NLE Y RO AD 10 18 A uchinleck's B rae 4 6 SM 15 3 WILLOWBANK ROW 13 19 3 8 SM 41 7Newhaven Church Slopin g mas onry Shelters 3 1 2 6 11 1 2 16 14 SM 5 23 22 19 2 1 20 2 4 13 4 1614 9 128 10 13 SM Shelter 2 1 5 2 4 5 4 87 78 7.3m ESS 31 54 4 13.3m 17 15 Posts W es tm os t C lo se 11 5 27 El Sub Sta 7 1 46 Auchinleck Court SM 130a 4 to 6 N EW H AVEN R O AD 124 to 128 17.3m 178 1 6 181 to 185 92 118 168 M ulberry Place 4 2 to 6 18 2 6 1 187 40 16.0m to 3 10 Surgery 195 8 TR A FA LG A R LA N E 164 180 172 to 176 10 2 SU M M ER SID E STR EET 1 34 96 to 100 39 130 8 Bonnington Terrace 12 LB 122 102 120 Shelter 197 to 201 104 10 2 11 12 D Fn 32 146 Shelter 36 Home 47 12 4117.1m 24 52 46 142 19 Club House Play Area 42 Bowling Green 144 141a Memorial 61 16 40 4 12 77 4 13 SU MM ER SID E 154 156 148 45 41 6 91 DUDLEY AVENUE Roseview 15 64 H aw thornbank Place 1 DUDLEY 16 Du dle y 1 44 D U D LEY G R O VE 7 50 Bowling Green 25 15 BANK Rannoch 54 7 DUD LEY GA RDE NS 23 9 King Edward VII 63 25a 10 96 3234 123 121 18 11 Pav The Shelter LB 3 DUDLEY CR ESCENT 13 PLACE Elderly Persons 6 17 20 44 13 C LA R K A V E N U E 52 13 19 60 17 B A N G H O LM P A R K 10 31 11 1 EAST LILLYPOT 9 1 19 10 5 13 15 1 39 5 11 TRINITY 14 Gardens 37 Fer ry R oad Pa th 16 17 42 40 Club 18 5 Club 83 20 to 24 El Sub Sta 18 9 10 CRAIG HALL GARD ENS 1 to 2 6 to 8 13 C R A IG H A LL R O A D 16 2 21.2m 17 to 20 23 43 5 14 Cy cle Tr ac k 21 33 CR AIG HA LL 19 35 21.2m 25 59 7 CRAIGHALL BANK El CR ESC EN T 23a 48 to 5 4 Sub Sta 12 t o 16 21 21.6m 2 87 3 2 LB 35 33 27 24 to 3 6 4 5 to 9 GR AN DV ILL E 23 3 22.0m 1 1 1 GRAN DFIEL D 68 70 Victoria Park 14 CR AIG HA LL AV EN UE 1 to 5 2 1 to 6 19 9 23d Child rens 23c 18 3a 15 9 183 Trinity 6 7 10 to 20 Academy El S ub S ta Victo ria P ark 37 to 41 Area 85 Cen tre Trees Sub Sta Primary School 38 to 4 6 4951 38 26 21 19 to 1 8 3 1 56 to 6 0 43 to 47 23 to 27 4 Play Chy We st B rea kw ate r 3 5 6 1 3 2 4 W ESTERN HARBO UR TERRACE 2 Gas Gov 16 L Twr L Twr L Twr B A N G H O LM LO A N 12 1 Bangholm Recreation Ground 20 Hall 6 230 to 234 1 4 1 Holy Cross C ycle P ath RC Church 2426 11 1 to 5 7 to 1 3 38 to 44 2 121 2 t o 6 2d 117 2 to 6 8 to 12 119 115a 2 5 7 131 16 12 3 123 1 FA IR BA IR N PL AC E MELROSE DRIVE 20 11 3 1 G LE N AR M P LA C E 11 to 15 5 to 93 G O O SA ND ER S TR EE T GO OS AN DE R PL AC E 7 11 10 6 4 12 28 24 1 13 22 20 3 26 2 36 34 14 5 9 30 26 1 SANDPIPER ROAD 2 2 4 16 WINDRUSH DRIVE N E W H A V E N P LA C E 32 SA ND PI PE R DR IV E 66 to 70 52 50 60 to 64 54 to 58 ESS 18 1 3 1 W ESTERN HARBO UR PLACE 4 6 WE ST ER N H AR BO UR DR IVE 1 WE ST ER N H AR BO UR BR EA KW AT ER 115 13 113 110 to 112 17 19 15 1 12 t o 18 40 to 44 34 to 38 4 to 10 1 t o 5 46 2 LINDSAY ROAD 7.3m School 8 2 NEWHAVEN MAIN STREET 1 Posts 2 P E A C O C K CO UR T Car Park GREAT MICHAEL 14 PH Victoria NEW HAVEN PLACE Tank Posts SQUARE PH 22 Primary 4 7.3m 29 25 9 1 to 7 25 3 36 7.3m 254 TCB 9 2 ANNFIELD 256 to 260 201 30 ESS 8 32 7.0m Wa rd Bd y W ard Bdy 2 H A V E N L A N E 55 5 3 38 42 19 127 125 ESS 14 129 18 19 Tank G re at M ic ha el C lo se Shelter 24 26 43 18 6 4 5 3 10 36 38 21 23 1 3 El Sub Sta Post Play Area Shelter Shelter Shelter Shelter W B Ps W ESTERN HARBO UR W AY WB 33 1 WE ST ER N H AR BO UR DR IVE 37 30 5 11 5 t o 9 44a 32 ESS ESS 16 12 17 Shingle Mean High Water Springs SM ESS Shelter 14 114 Trinity P ath 9 22 SM Pipes 6 8 Sloping m asonry 7.9m 7 8 45 13 LA V E R O C K B A N K A V E N U E LAVER OCKB ANK G ARDE NS 2 50 10 EA ST TR IN ITY R OA D 10 LAVER OCKBA NK GR OVE 2b 13 8 to 10 52 MAYV ILLE G ARDEN S EAS T 11 LAVERO CKBAN K CRES CENT 2 S O U TH LA V E R O C K B A N K A V E N U E 14 17 STARBANK ROA D 32 25 1 58 14 20 2 8 18 40 49 to 53 1 29 9 25 1 1 9 2 11 20 8 13 30 22 4 25.6m 5 D Fn 44 2a SM 15 24 to 2 8 16 36 Y O R K R O A D 5 31 ROSE VILLE GARD ENS 12 23 34 50 LA V E R O C K B A N K R O A D 25.5m 17 55 56 22 to 24 25 24.6m 26 16 6.7m 14 32 42 25 21 SD 9 28 PC 2 1 13 38 PH 1 27 Shingle TRINITY CRESCENT TR IN IT Y C R E S C E N T 6 6 3 Y O R K R O A D 15 25 a 31 7 9 2 7.0m R U S S E LL P LA C E 10 15 21 17 to 2 0 6 to 8 11 23 22 16 31 11 45 5 30 47 19 27 43 24 25 to 29 Shelter 10 23a 46 LIXM OUNT GARDENS D Fn Starbank P ark STARB ANK R OAD (PH) Old Chain Pier 64 1 9 8 19 1 3 37 41 39 35 29 13 19 30 26 62 7 6 32 9 7 14 17 15 13 167 24 43 22 9 10 59 34 3 10 16 36 38 17 40 9 36 11 17 16 27 29 3 1 24 11 12 116 2 to 6 MAYV ILLE G ARDE NS LB 16 Elderly Persons Home 21 15 57 1 24 23 2 4 60 to 6 4 7.0m 12 28 MHWS Sloping masonry LB Fn 14 6 10 15 8 2 4 L Twr Centre Education L Twr 23Outdoor Pavilion 27 11 26 B E R E S FO R D A V E N U E 5 1 1 89 53 51 11 Surgery 45 75 17 BE RE SFO RD GA RD EN S 2 23 18 to29 4 4 36 14 2 TERRACE 73 75a 28 201 18 2 B E R E S FO R D P LA C E 23 19 22 68b 1 5 2 13 27.9m 25.6m LIXM OUNT AVENUE 25 Cy cle Tr ac k L Twr Trinity P ath 97 12 35 26 27 95 9 9 11 13 33 15 1 3 71 Earl Haig 69 26.1m 7 17 Club 5 21 38 BANG HOLM ROAD 6 5 2 CLA RK PLA CE 7 2 3 C LA R K R O A D 36 813 22 10 35 Tunnel 5 BERESFORD 62 2 1 28.1m 24 TRINITY M AINS 101 25 8 3 to 8 3 TRIN ITY G ROV E 66 1 10 to 12 99 23 1 68 100 Haw thor nva le P ath 45 47 41 19.5m 25 to 29 31 to 35 46 52 8 29 16 1 W H A LE B R A E 1 210a 168 10a 2 N E W H A V E N R O A D 27 LB 21 1 238 26 12 6 37 to 41 68 to 72 42 24 3/ 1 3 1 HAW THOR NVAL E 210b 15 23 33 4 PARK ROAD D U D LE Y TE R R A C E 176 5 54 194 18.5m 80 186 11 16 3 244 to 248 82 to 86 11 4 PO 20.2m 243a 7 20 3 242 20 19 240 N E W H A V E N R O A D 21 1 9 N E W L A N E 198 3 62 to 66 El Sub Sta 202 172 24 3/ 2 25 250 14 2 212 43 204 1 74 to 78 3 6 8 10 29 7 43 6 184 2 166 JESSFIELD TERRACE 16 8a 232 4 23 4 16.4m 3 48 210 208 D E R B Y S TR E E T 56 to 60 P os ts Twr Edinburgh 21 Workshop 192 190 10 218 14 1 19 17 3 27 6 16 8 12 184 6 108 216 88 To 92 El S helter Trinity 12 30 GREAT MICHAEL RISE 220 to 230 17.1m Sculpture 22 Trees 10 1 215 3 78 20.5m 9 6 82 4 20.7m 2 17.8m 205 P Hotel 1 Bonnin gton 182 24 to 28 211 8 P LA C E 14 BON NING TON GRO VE 207 223a 99 192 36 to 40 223 1 13 1 to 1 37 16.7m Chanc elot T errace Day C entre 14 1 10 3 9 Stedfastgate TERRA CE 1 to 515 30 to 34 Bonnin gton B ank (Nursi ng Ho me) House Ward B dy Tennis Courts Sports Court Sports Court TreesTrees Sub Sta TCB Shelter Shelter Holy Cross LB 4 PCB Gardens El Bowling Greens Allotment Pav ilion VIC TO R IA PAR K N EU K 5 80 Trinity House Care Home 21.7m 218 to 222 BANGHOLM GROVE CHANCELOT 1 24 224 to 228 CRAIG HALL TERR ACE 2 El Sub Sta 1 8 7 5 1 to 3 7 NEW C UT RIG G 202 223 18.5m B O N A R 225 Craigh all 2 to 4 19.0m FERR Y ROA D 227 P 7 11 to 13 22.5m 14 B A N G H O LM V IE W 2 CRESCENT 19.6m 20.3m AGNEW 221 2 Ward B dy Primary School Victoria Path Ward B dy 12b 33 30 48 51 52 4 17 4 to 6 28 NIC HOL LFIE LD Ba nk 29 17 20a 7.8m 15 54 1 2 Annfield P H 20 2 8 to 1 4 3 20 3 51 Post 21 36 3 8 20 10 LINDSAY ROAD 1 13 13 22 to 26 31 7 11 23 16 NICHOLLFIELD 7 to 9 12 11 1 18 53 19 3 9 15 ANNFIELD STREET 7 5 19 34 Anchorfield 33 28 38 18 16 4 2 12 3 2 Ma nse PH 13 Ward Bdy W ard Bdy 11 9 12 75 73 94 95 93 9 To 11 111 109 6 5 25 20 26 17 22 12 C ottage 61 28 to 32 49 53 39 34 29 47 40 25 Post Shelters 84 10 to 14 22 16.8m 10 4 11 9 to 19 1 203 1 to 7 106 75 90 Mount 13 Shelter 21 to 2 9 16 Shelter NS-01 NS-03 NS-04 NS-05 NS-06 NS-07 NS-09 NS-08 NS-10 NS-11 NS-12 NS-13 NS-14 NS-15 NS-16 NS-17 NS-19 NS-21 P1 P3 P4 NS-22 NS-02 NS-24 NS-23 NS-25 P2P2 NS-26 NS-28 NS-27P5 NS-29 DRG.... Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. 100023420 (2015) 0 6.25 25 50m12.5 0 6.25 25 50m12.5 WILLOWBANK ROW 4 29 25 3 7.3m 254 TCB 2 ANNFIELD 256 to 260 1 30 42 33 45 47 19.5m 25 to 29 31 to 35 52 8 W H A LE B R A E 1 10a 2 N E W H A V E N R O A D 238 26 12 37 to 41 68 to 72 24 3/ 1 3 1 23 4 PARK ROAD 5 54 80 11 244 to 248 82 to 86 20.2m 243a 242 20 240 9 N E W L A N E 62 to 66 El Sub Sta 24 3/ 2 250 14 43 74 to 78 6 8 10 7 43 6 2 JESSFIELD TERRACE 16 8a 232 4 4 16.4m 48 D E R B Y S TR E E T 56 to 60 Twr 21 10 218 14 6 16 8 12 4 6 108 216 88 To 92 12 GREAT MICHAEL RISE 220 to 230 22 NS-05 NS-06 NS-10 NS-11 LEGEND 1280L NON-RECYCLABLE WASTE 1280L MIXED RECYCLING BIN 660L GLASS RECYCLING BIN 240L FOOD WASTE RECYCLING BIN AND HOUSING BULL BAR DRG.

    https://www.edinburgh.gov.uk/downloads/file/31442/newhaven-south
  • Https://www.edinburgh.gov.uk/performance-update-report-november-21

    A new city wide approach to commissioned advice services is agreed with partners N o t a p p li c a b le o n e o ff Q3 21/22 This project is being progressed by the Edinburgh Partnership.... and it will now move into the statutory representation period (starting 7 Nov) Outline business case for the new Bio Quarter health innovation district agreed N o t A p p li c a b le o n e o ff Sep-21 Business case approved at Policy & Sustainability in October 2021 Outline business case for the West Edinburgh Active Travel and Public Transport infrastructure agreed N o t A p p li c a b le o n e o ff Sep-21 This project is part of the City Region Deal.... South West Pilot action plan finalised N o t A p p li c a b le o n e o ff Nov-21 Work to develop the South West Pilot action plan is underway.

    https://www.edinburgh.gov.uk/downloads/file/30356/performance-update-report-november-21
  • Https://www.edinburgh.gov.uk/appendix-4---gmdt-outline-business-plan

    Inclusion focused” https://www.nurturedevelopment.org/blog/asset-based-community-development-5-core-principles/ Greenspace in Edinburgh “ Greenspace Scotland states that greenspace makes up between 40 and 49% of Edinburgh, 6,000 hectares of land in total, making it the top city in the UK for greenspace (BBC).... These are: • Ecosystem Restoration • Investment in Natural Capital • Quality Greenspace for health and education benefits • Conserving wildlife in Scotland • Sustainable management of land and freshwater • Marine and coastal ecosystems restored All of the actions in the Edinburgh Local Biodiversity Action Plan 2019-2021 can be linked directly to at least one, and in most cases more than one, of these Scottish priorities.21 Reference to Sustainable Edinburgh 2030 strategy ie the climate plan 2030 Climate Strategy – The City of Edinburgh Council See also the 2030-climate-strategy-strategic-environmental-assessment-sea-post-adoption- statement (edinburgh.gov.uk) the 3 key agencies for delivery include HES SEPA and nature.scot; see also on p3 focus on Granton and north of city v little mention of the south Edinburgh and Glasgow top UK list of green space cities - BBC News Edinburgh's Present Greenspace - My CMS (edinburghlivinglandscape.org.uk) Natural Capital There is substantial research evidence of the relevance and benefits of natural capital approaches to the Gracemount Mansion community hub. 1 .

    https://www.edinburgh.gov.uk/downloads/file/33891/appendix-4---gmdt-outline-business-plan
  • Https://www.edinburgh.gov.uk/appendix-4-gmdt-outline-business-plan

    Inclusion focused” https://www.nurturedevelopment.org/blog/asset-based-community-development-5-core-principles/ Greenspace in Edinburgh “ Greenspace Scotland states that greenspace makes up between 40 and 49% of Edinburgh, 6,000 hectares of land in total, making it the top city in the UK for greenspace (BBC).... These are: • Ecosystem Restoration • Investment in Natural Capital • Quality Greenspace for health and education benefits • Conserving wildlife in Scotland • Sustainable management of land and freshwater • Marine and coastal ecosystems restored All of the actions in the Edinburgh Local Biodiversity Action Plan 2019-2021 can be linked directly to at least one, and in most cases more than one, of these Scottish priorities.21 Reference to Sustainable Edinburgh 2030 strategy ie the climate plan 2030 Climate Strategy – The City of Edinburgh Council See also the 2030-climate-strategy-strategic-environmental-assessment-sea-post-adoption- statement (edinburgh.gov.uk) the 3 key agencies for delivery include HES SEPA and nature.scot; see also on p3 focus on Granton and north of city v little mention of the south Edinburgh and Glasgow top UK list of green space cities - BBC News Edinburgh's Present Greenspace - My CMS (edinburghlivinglandscape.org.uk) Natural Capital There is substantial research evidence of the relevance and benefits of natural capital approaches to the Gracemount Mansion community hub. 1 .

    https://www.edinburgh.gov.uk/downloads/file/33891/appendix-4-gmdt-outline-business-plan
  • Services agreement for use by public sector bodies

    Council's Protected Information: means any information provided by the Council to the Service Provider which (i) carries a protective marking such as “Official”, “Secret” or “Top Secret”; or (ii) is exempt information as set out in Part 2 of FOISA (disregarding for that purpose whether a provision of Part 2 does not confer absolute exemption within the meaning of section 2(2) of FOISA).... Management Reports must be clear and concise, and provide a top level summary of performance with supporting documents.

    https://www.edinburgh.gov.uk/downloads/file/29803/long-form-goods-and-services
  • Https://www.edinburgh.gov.uk/review-of-housing-need-and-demand-in-edinburgh

    To provide a sample from different sections of the market, data was collected from the top-ten (non-advertised) web-sites features when using the search terms ‘property for sale in Edinburgh’ and ‘property for rent in Edinburgh’.... The Resolution Foundation also found that nearly one-third of lower-paid employees had lost jobs or been furloughed, compared to less than one-in-ten top earners, with these experiences also more common among atypical employees (including those with variable hours and zero-hour contracts)35.

    https://www.edinburgh.gov.uk/downloads/file/30164/review-of-housing-need-and-demand-in-edinburgh