Search results

You searched for tỷ lệ cá cược bóng đá ngày hôm nay-✔️SIEUCACUOC.NET✔️Top nhà cái bóng đá, casino uy tín, thành viên mới tặng ngay 100k

Results 1501 – 1510 of about 1708.

Refine by:

  • All results
  • Microsoft Word - Appendix 1 - LDP Action Programme 2019 16 01 19 v3

    To link with suitable exit points around site boundary, Paths (1000m) £300,000 £367,500 To be delivered as integral part of development secured through planning condition(s).Cyc le / pedestrian rail bridge Place Development 2024/25 Network of high quality pedestrian/cycle routes through site.

    https://www.edinburgh.gov.uk/downloads/file/25280/january-2019
  • Https://www.edinburgh.gov.uk/monitoring-statement

    Map 29 shows the locations of new hotel development that has taken place since 2013 against public transport accessibility levels. 103 Map 29: Hotel development 2014 – 2019 A locational analysis of rooms completed since 2014 is given in chart 54 below. 104 Chart 54: Hotel rooms completed 2014 - 2019 A detailed view of newly completed hotel development in the city centre is given in map 30. 0 500 1,000 1,500 2,000 2,500 City Centre IBG/Airport/Royal Highland Showground Outwith Centre/Good accessibility Elsewhere R o o m s co m p le te d Hotels Serviced Apartments 105 Map 30: Hotel development 2014 – 2019 in the City Centre 106 Retail Charts 55 and 56 below shows how the stock of retail units in Edinburgh has changed over the last 20 years.

    https://www.edinburgh.gov.uk/downloads/file/26866/monitoring-statement
  • Edinburgh Strategic Sustainable Transport Study - Phase 1

    Edinburgh Strategic Sustainable Transport Study - Phase 1 | Report 28 Table 3-3: Objectives and associated measures Metric Sustainable Economic Growth and Development Improved equity & social inclusion Reduce transport- related carbon emissions Improved built & natural environment Improved health, wellbeing & safety S u st a in a b le e co n o m ic g ro w th S u st a in a b le l a n d u se d e v e lo p m e n t Im p ro v e d a cc e ss t o j o b s, e d u ca ti o n , h e a lt h ca re a n d le is u re A ff o rd a b il it y P o si ti v e i m p a ct o f tr a n sp o rt in fr a st ru ct u re o n p la ce ( n e w a n d e x is ti n g e .g .... ci ty c e n tr e ) P h y si ca l im p a ct o f tr a n sp o rt m e a su re s P ro m o ti n g h e a lt h ie r li fe st y le s v ia p h y si ca l a ct iv it y R e d u ce d l o ca l e m is si o n s / im p ro v e d a ir q u a li ty R e d u ce d a cc id e n ts ( b a se d o n c h a n g e i n c a r k m s) Public transport connectivity (incl. reliability, capacity & quality)    Accessibility via public transport       Enhanced active travel connections           Provision of direct high-quality public transport access to key housing/mixed use sites (existing designations)          Support new employment by enhancing access to and attractiveness of key designated employment areas       Mode shift potential (shift from car to public transport /active modes) and resulting reduction in car kms

    https://www.edinburgh.gov.uk/downloads/file/26872/edinburgh-strategic-sustainable-transport-study
  • Practitioner TOOLKIT

    Treatment Outcome Profile (TOP) TOP is a tool which measures change and progress in five key domains: substance use, injecting risk behaviour, crime, health and quality of life.... TOP has been adopted as an outcome tool by most drug services in England and Wales.... Julie has a ‘medicine box’ for her methadone (70 mls daily) and keeps this in a top shelf in her bedroom wardrobe.

    https://www.edinburgh.gov.uk/downloads/file/23063/capsm-practitioners-toolkit
  • Practitioner TOOLKIT

    Treatment Outcome Profile (TOP) TOP is a tool which measures change and progress in five key domains: substance use, injecting risk behaviour, crime, health and quality of life.... TOP has been adopted as an outcome tool by most drug services in England and Wales.... Julie has a ‘medicine box’ for her methadone (70 mls daily) and keeps this in a top shelf in her bedroom wardrobe.

    https://www.edinburgh.gov.uk/downloads/file/23063/capsm-practitioner-s-toolkit
  • Edinburgh SDCF needs assessment and feasibility study FINAL

    Findings from an Evalua.on of London’s Temporary Overdose Preven.on Site (TOPS).... Table 13 lists the top ten beat areas with the highest number of total incidents in 2021 and 2022, alongside the ward and locality that corresponds to the beat area.... It's not the top of my list.

    https://www.edinburgh.gov.uk/downloads/file/34563/edinburgh-sdcf-needs-assessment-and-feasibility-study-report
  • Leith Walk Total Closure FOTW to Pilrig Street TM001

    C h e ck e d B y : S P 8 4 1 x5 9 4 (A 1 ) O rig in a l D ra w in g S iz e D ra w in g N o : R e v isio n : S m a il@ c la sso n e .o rg w w w .c la s so n e .o rg D ra w n B y : S P S c a le : N .T .S D a te : D a te R e v CAS L R e vis io n S e a b e g s R o a d , C h ck d b y R e v b y P e d e stria n h e a d b a se T ra ffic sig n a l h e a d b a se fo r p e d e stria n c ro ss in g 2 6 /0 6 /2 0 2 2 3 3 8 8 9 - T M 0 0 2 M L o ca tio n o f d e d ic a te T ra ffic M a rsh a ll to a llo w a cce ss to v a rio u s sid e stre e ts a n d d ire ctio n s to th e se to b e m a n a g e d b y R a d io s

    https://www.edinburgh.gov.uk/tramstonewhaven/downloads/file/618/leith-walk-closure-foot-of-the-walk-to-pilrig-street
  • Leith Walk Total Closures TM001

    C h e ck e d B y : S P 8 4 1 x5 9 4 (A 1 ) O rig in a l D ra w in g S iz e D ra w in g N o : R e v isio n : S m a il@ c la sso n e .o rg w w w .c la s so n e .o rg D ra w n B y : S P S c a le : N .T .S D a te : D a te R e v CAS L R e vis io n S e a b e g s R o a d , C h ck d b y R e v b y P e d e stria n h e a d b a se T ra ffic sig n a l h e a d b a se fo r p e d e stria n c ro ss in g 2 6 /0 6 /2 0 2 2 3 3 8 8 9 - T M 0 0 1 M L o ca tio n o f d e d ic a te T ra ffic M a rsh a ll to a llo w a cce ss to v a rio u s sid e stre e ts a n d d ire ctio n s to th e se to b e m a n a g e d b y R a d io s

    https://www.edinburgh.gov.uk/tramstonewhaven/downloads/file/619/leith-walk-closure-foot-of-the-walk-to-mcdonald-road
  • Https://www.edinburgh.gov.uk/addendum-november-2016

    No 39    Interventions proposed R ed uc e co ng es tio n R ed uc e tr av el b y ca r R ed uc e ad ve rs e im pa ct s of tr av el P ro m ot e w al ki ng an d cy cl in g In te gr at ed p ub lic tr an sp or t Te ch ni ca l de liv er y Technical Delivery Comment Apply - Yes/No Travel Plan – implement travel plan (agreed MST, monitoring, soft & hard measures)... +1 +1 +1 +2 +1 +2 Relevant Yes 49    Interventions proposed R ed uc e co ng es tio n R ed uc e tr av el b y ca r R ed uc e ad ve rs e im pa ct s of tr av el P ro m ot e w al ki ng an d cy cl in g In te gr at ed p ub lic tr an sp or t Te ch ni ca l de liv er y Technical Delivery Comment Apply - Yes/No Active Travel – Help provide additional cycle parking at Curriehill Station... +1 +1 +1 +1 +1 +3 Not complicated; relevant Yes 50    Interventions proposed R ed uc e co ng es tio n R ed uc e tr av el b y ca r R ed uc e ad ve rs e im pa ct s of tr av el P ro m ot e w al ki ng an d cy cl in g In te gr at ed p ub lic tr an sp or t Te ch ni ca l de liv er y Technical Delivery Comment Apply - Yes/No Public Transport – Support the enhancement of bus capacity during peak periods

    https://www.edinburgh.gov.uk/downloads/file/25277/addendum-november-2016
  • Https://www.edinburgh.gov.uk/performance-update-report-november-21

    A new city wide approach to commissioned advice services is agreed with partners N o t a p p li c a b le o n e o ff Q3 21/22 This project is being progressed by the Edinburgh Partnership.... and it will now move into the statutory representation period (starting 7 Nov) Outline business case for the new Bio Quarter health innovation district agreed N o t A p p li c a b le o n e o ff Sep-21 Business case approved at Policy & Sustainability in October 2021 Outline business case for the West Edinburgh Active Travel and Public Transport infrastructure agreed N o t A p p li c a b le o n e o ff Sep-21 This project is part of the City Region Deal.... South West Pilot action plan finalised N o t A p p li c a b le o n e o ff Nov-21 Work to develop the South West Pilot action plan is underway.

    https://www.edinburgh.gov.uk/downloads/file/30356/performance-update-report-november-21