Are you a resident or business in the local area? Join our mailing lists

Additional Traffic Management Arrangements as of 26 July 2021

Weekly Traffic Management

Please find below a summary of additional traffic management arrangements to accommodate site investigations works and utility diversions outside the main area of works.

Traffic management arrangements for the main area of works are available to view and download.

 

LEITH WALK

Leith Walk Traffic Lane – Closure

The traffic lane on Leith Walk will be closing from Foot of the Walk to Pilrig Street on Friday 6 August from 7pm to 5:30am on Saturday to complete repairs to the carriageway.

Local access/egress will be maintained via Foot of the Walk for Castlebank Street, Crown Street and Crown Place and access/egress for Stead’s Place/Springfield Street, Smith Place and Jameson Place maintained via Dalmeny Street. Traffic marshals will be on hand to assist throughout the closure.

Works will be taking place at the Manderston Street junction where a localised pedestrian diversion will also be in place around the works.

View the Leith Walk closure traffic management plan (PDF). 


Iona Street - Road Closure

The road closure on Iona Street from Leith Walk to the junction of Buchanan Street commenced on Monday 14 June for approximately 16 weeks for drainage system works.  Parking has been suspended for the duration of the closure with pedestrian access being be maintained. 

View more information on the Iona Street road closure.


Antigua Street

Antigua Street utility diversion works have been extended for two weeks due to further works in the area.  Works are expected to be complete week commencing Monday 9 August. As part of the works being undertaken on the Trams to Newhaven Project and following on from the site investigation works in April 2021 we will be carrying out utility diversion works within the footpath and parking/loading areas at Antigua Street. Parking and loading restrictions will be in place with access to Gayfield Square via the north entrance.  

View the Antigua Street traffic management plan (PDF).  


Leith Walk at Laurie Street - Footpath Closure 

The footway on the west side between Foot of the Walk and Laurie Street is currently closed.


Springfield Street - Footway Works

From Monday 2 August the fence line near Springfield Street will be extended west to accommodate footway works for approximately six weeks. Pedestrian access will be maintained at all times.


Leith Walk - Cycleway Closure 

To progress with construction of the permanent cycleway from Annandale Street to Foot of the Walk, we have closed the temporary cycleway for the full length of Leith Walk.

Find out more information on the Leith Walk cycle lane closure. 


Manderston Street – Temporary Road Closure

The road closure on Manderston Street will remain in place until early August 2021 to carry out repairs on the carriageway at the junction of Leith Walk.

Download the Manderston Street traffic management drawing (PDF)


Lorne Street - Road Closure 

We are installing the new attenuation pipes which will support surface water drainage in the local area. To facilitate these works Lorne Street is closed from Leith Walk to the junction of Lorne Place. These works started on Monday 28 June for approximately seven weeks.  Access to Lorne Place, Lorne Square and South Lorne Place is via Easter Road.  Pedestrian access is maintained however parking is also suspended for the duration of the closure. 

View Lorne Street traffic management plan (PDF). 


Brunswick Street – Large Vehicle Restrictions 

Vehicles over 3.5T are not currently able to access Brunswick Road. This restriction is in place until late Summer 2021.

View Brunswick Road traffic management plan (PDF).

 

FOOT OF THE WALK TO NEWHAVEN 

Ocean Drive - Traffic Management Changes

We've made revisions to traffic management on Ocean Drive to advance tram infrastructure works. This section of works has extended eastbound. Parking restrictions are in place to accommodate the new arrangements. 

Find out more about traffic management changes on Ocean Drive.


Ocean Drive - Next Phase of Works Begin

The next phasing of works on Ocean Drive at Stevedore Place will start on Monday 26 July. Site will be established on the south side of Ocean Drive.

View more information on the next phasing of Ocean Drive works.


Traffic Management Adjustments at Constitution Street/Ocean Way junction with Tower Street

The current traffic management arrangements at the Constitution Street/Ocean Way junction with Tower Street to include an additional traffic light head at Constitution Place, changed from 3-way set up to 4-way. 

View the updated traffic management plan for Constitution Street/Ocean Way (PDF). 

 

Baltic Street Junction - Temporary Traffic Lights

The carriage way at Bernard Street/Baltic Street junction has been reduced to one lane traffic, controlled by temporary traffic lights. This will be in place from Wednesday 21 July until Monday 2 August.

View more information on the Baltic Street/Bernard Street junction traffic management plan. 


Tower Street - Footpath Closure

We will be carrying out utility works within the footpath on Tower Street near the junction with Constitution Street from Monday 26 July for approximately two weeks.  Footpath closure and diversion signs will be in place while we carry out these works with access being maintained at all times.


Ocean Drive - Footpath Closure 

The footway on Ocean Drive is currently closed, this is to allow structural works on Victoria Bridge. Diversions will be in place for all pedestrians/cyclists. These arrangements started on Monday 24 May and are expected to be in place for up to 20 weeks. 

View more information on the Ocean Drive footpath closure. 


Mitchell Street – Road Closure

UPDATE: The closure on Mitchell Street / Maritime Lane will remain in place until late August / early September.  This is to accommodate hard landscaping and public realm works in the area.

We will be closing vehicle access to Maritime Lane from Mitchell Street on Wednesday 7 April. This closure is to progress track works across the junction and is expected for up to ten weeks. A  temporary pedestrian walkway connecting both sides of the street between Queen Charlotte Street and Mitchell Street/Maritime Lane has been installed and will be in place to facilitate the ongoing works.

You can view the Mitchell Street temporary traffic management arrangements here (PDF).


Constitution Street – List Footpath Works for Works

Constitution Place to Baltic (east side)

There are new arrangements for pedestrians between Baltic Street and Constitution Place. These arrangements started on Friday 7 May and are expected to be in place for up to 12 weeks. Access to affected business will be maintained at all times. 

View the traffic management plan here (PDF). 

Tower Street to Bernard Street (west side)

There are new arrangements for pedestrians on the west foot way between Tower Street and Bernard Street.  These arrangements are expected to be in place for until late August 2021. Access to affected business will be maintained at all times. 

View more information on Constitution Street footway changes. 

Constitution Street – Footway Closure

The footway on the west side of Constitution Street, at the corner of the Royal Bank of Scotland is closed travelling north bound down Constitution Street. These works started on Thursday 10 June 2021 and is expected to be in place for approximately ten weeks. Access to properties is maintained via the east side of Constitution Street/Baltic Street. 

Constitution Street from Queen Charlotte Street to Bernard Street / Baltic Street

Hard landscaping and reinstatement works have started within the existing site set-up. In order to continue with these works we are extending our work space in to the footway. These new temporary arrangements will see existing fence lines being extended towards properties with the commencement of hard landscaping/public realm works. Access will be maintained to properties which will lead into a temporary footway that will be created on the newly laid tracks.

Constitution Street – Maritime to Bernard (west side)

Hard landscaping and reinstatement works started within the above location on Monday 5 July.  To accommodate these works we extended our work space in to the footway. Access will be maintained to properties and the local area.

 

Published: 26th July 2021