Are you a resident or business in the local area? Join our mailing lists

Additional Traffic Management Arrangements as of 19 January 2021

Weekly Traffic Management

Please find below a summary of additional traffic management arrangements to accommodate site investigations works and utility diversions outside the main area of works.

Traffic management arrangements for the main area of works are available to view and download.

Leith Walk

Pilrig Street to Dalmeny Street - Footpath and Cycleway Adjustments 

There have been minor adjustments to the cycleway on Leith Walk between Pilrig Street and Dalmeny Street to accommodate the works. Pedestrians and cyclists will be diverted around the works using a suitable alternative route with diversions in place. Signage will be installed in the local area to let pedestrians and cyclists know about the diversion and the recommended route. 

Find out more information on the Leith Walk cycle lane adjustments. 

Movement of Pedestrian Crossing - Leith Walk at Dalmeny Street 
 
The pedestrian crossing on Leith Walk at Dalmeny Street will be moving to the north side of Arthur Street on Wednesdsay 20 January to facilitate works.

Download the Leith Walk at Dalmeny Street junction traffic management plan (PDF).


Road Closure – Springfield Street / Road Opening – Stead’s Place
 
Access and egress to Springfield Street from Leith Walk will be closed from Tuesday 26 January.  Traffic will be diverted via Stead’s Place which will be opened to facilitate the closure.
 
Download the Springfield Street / Stead's Place traffic management plan (PDF). 


Movement of Pedestrian Crossing - Leith Walk at Springfield Street / Stead's Place

The Leith Walk pedestrian crossing at Springfield Street/Smiths Place will be moving to the north side of Stead’s Place on Tuesday 26 January to facilitate the works.   

Download the Springfield / Stead's Place pedestrian management plan (PDF).


Jane Street at Jane Street Industrial Estate - Temporary Road Closure - UPDATE

Due to the complex nature of the utility diversion works the duration of these works have been extended to mid-March 2021. We are also required to undertake further excavation works on Jane Street at the Junction with Leith Walk. 

These works will commence on Monday 18 January 2021. Parking will be restricted however pedestrian access and vehicle access to businesses will be maintained at all times.

Download the Jane Street temporary road closure traffic management plan (PDF)


Manderston Street – Temporary Road Closure

Manderston Street will be closed at its junction with Leith Walk to facilitate utility diversion works from Monday 18 January 2021 for approx. 7 weeks.  Localised diversions and parking restriction will be in place with pedestrian access being maintained at all times.

Download the Manderston Street traffic management drawing (PDF)


Leith Walk – Traffic Lane

There will be adjustments to the traffic lane on Leith Walk at Manderston Street to accommodate utility diversion works.  This will be in place from Monday 18 January 2021 for approx. 7 weeks. 

Download the Manderston Street traffic management drawing (PDF)

 

Foot of the Walk to Newhaven 

FOTW – Laurie Street

Alternative footpath arrangements have been installed to accommodate works – pedestrian diversion signage is in place and access to properties will be maintained at all times.


Lindsay Road at Anchorfield – Works on footpath

We will be carrying out utility investigation works on the footpath on Lindsay Road at Anchorfield on Wednesday 13 January for approx. 3 days.  Pedestrian diversion signage will be in place. 


Constitution Place/Ocean Way – BT Duct Installation Works

We will be carrying out BT duct installation works on the corner of Constitution Place/Ocean Way.  Works will commence on Tuesday 19 January for approx. 4 days.  To facilitate these works additional traffic management arrangements and footpath diversions will be in place.   

Download Constitution Place/Ocean Way traffic management plan (PDF).

Published: 19th January 2021